Skip to main content

Concrete paving success with Power Curbers

A concrete paving contractor in Florida reports success in a range of projects. Brevard Concrete Paving started small, with one truck and trailer, and the firm’s initial projects were jobs such as the installation of residential kerbs, pedestrian walkways and driveways. Soon, the firm had branched out to a wide range of duties such as paving filling station areas and work for the Florida Department of Transportation.
August 31, 2022 Read time: 3 mins
Equipment from Power Curbers has proven highly versatile for a US contractor in Miami

As the firm grew, the projects it was asked to complete continued to grow in size and complexity, which meant the types of equipment to build them also needed to expand.

Brevard Concrete poured kerbing for a few years using two Power Curber 150 Extruders that were bought in 2017 and 2019. Then, as needs grew, the firm ordered a 5700-D curb and gutter machine that was delivered in 2020. It was immediately put into service, and in 2021, the company slipformed nearly 24,400 linear metres of kerb with it. As the work expanded even further and the company realised it needed an additional tool, a Power Curber 7700 Multipurpose Machine was ordered.

The firm won the contract to expand an aircraft taxiway at what used to be Patrick Air Force Base. Located just a little south of Cape Canaveral, the base is now Patrick Space Force Base, one of six active installations of the new service branch. Patrick was originally a Naval Air Station, opened in 1940, and then turned over to the Air Force in 1948. The recent change in status for the installation meant that improvements were needed to increase capacity.

Brevard’s work on the taxiway called for 2,354m3 of concrete, poured 584mm thick. The extreme paving depth required careful planning and preparation, including steel forms.

The firm had two months to complete the project and would pave around two times/week, with a total of ten pours. The firm would pave 6m sections, pour 6m, skip 6m and then pave the next 6m. Work started at 6am and continued until 10am.

The next Brevard project for their 7700 was another airport facility, Vero Beach Regional Airport, about seventy miles south of Cocoa. A few years earlier, Brevard had completed a ramp for the airport, and the new job was phase two of that project. Some 4,707m3 of concrete were slipformed in 4.6m-wide sections. The firm had a total of eighteen pours, each 206m long. Ultimately, the new ramp will have hangars built around it, and planes will use the ramp to access the taxiway to runways.

Getting the ramp finished and in operation quickly was critical for the client, so the construction contract included a penalty of ten thousand dollars per day in liquidated damages for each day the project was late. Brevard completed around 274m/day, starting at 4am and finishing around 10am, with machine pours every Monday, Wednesday, and Friday, with Saturday as a backup. And they completed the project on time.

Even as that project was ongoing, other customers were lining up for Brevard’s 7700. Another Florida concrete contractor had a complex project in the area with two types of heavy-duty barrier sections. But it lacked the right equipment to handle the task. They contacted Power Curbers and learned only one company in the area had a big enough machine for the job: Brevard Concrete Paving.

For more information on companies in this article

Related Content

  • Power Curbers sees strong machine sales
    May 15, 2019
    Power Curbers has seen strong sales of its machines during 2018, with demand expected to continue through 2019 – Mike Woof writes Power Curbers has seen strong sales for its slipformers during 2018, with customers keen to replace ageing equip-ment. Sales of the 5700-C have been very healthy. One of the key changes in the market that Power Curbers has observed is with the growing interest in machine control solutions amongst its customers. Power Curbers said that there has been a massive change in custom
  • Silver Star marries a Topcon GPS system to a Power Curber 5700-C
    January 19, 2016
    In the US state of Oklahoma, Silver Star Construction has adopted 3D technology for site modelling and stringless machine control The company, based in the town of Moore, recently used a Topcon Millimeter GPS system mounted on one of their Power Curber 5700-Cs to put down nearly 5,500m of curb and gutter in a residential housing addition in south-west Oklahoma City. Once the dirt work and grading was completed, the concrete crew got to work by mounting the Topcon receivers on their 5700-C. The Topcon
  • Concrete surface for runway paving job
    January 18, 2016
    The Fort Lauderdale-Hollywood International Airport in Broward County, Florida, was suffering departure delays on every single flight. The existing 9R-27L runway was too short at 1615m in length, affecting capacity at the airport. To deal with the issue, the Broward County Board of County Commissioners created a plan to extend the southern runway to 2438m to accommodate larger commercial aircraft. The project was not simple however and could not be achieved by tearing out the existing runway and buil
  • Revamped concrete runways now in use at Sydney Airport
    November 15, 2013
    Sydney now has a renovated airport runway thanks to contractors Antoun Civil Engineering and Volumetric Concrete Australia. The airport is a major facility as it is the international hub for airlines like Jetstar Airways and Qantas and handles around 37 million travellers each year, with almost 300,000 aircraft movements. Wear was an issue and the decision was made by the Sydney Airport Corporation Limited (SACL) to replace the concrete slabs that make up the runway system. Originally constructed in the 195