Skip to main content

Chicago Pneumatic’s new concrete stars

Chicago Pneumatic (CP) has unveiled its comprehensive new concrete equipment range. In applications from walls to floor slabs, the range has products to cover every step of the job, from vibration and levelling to finishing and cutting. Freshly poured concrete has air voids which must be removed by vibration to increase its density and finished strength. Depending on the concrete’s depth and slump, this can be achieved using a poker or screed. Customers can now choose mechanical, electric or pneumatic p
May 14, 2014 Read time: 3 mins
6097 Chicago Pneumatic (CP) has unveiled its comprehensive new concrete equipment range. In applications from walls to floor slabs, the range has products to cover every step of the job, from vibration and levelling to finishing and cutting.

Freshly poured concrete has air voids which must be removed by vibration to increase its density and finished strength. Depending on the concrete’s depth and slump, this can be achieved using a poker or screed. Customers can now choose mechanical, electric or pneumatic pokers from CP to best meet their specific application and concrete type.

The new durable and user-friendly VPM mechanical pokers are ideal for mid-sized construction sites using medium-to-high slump concrete. VPE electric pokers are ideal where low noise, low maintenance, light pokers are required. They offer fast start-up, a wide action radius and rapid acceleration for medium-to-high slump concrete. For jobs of any size with low-to-high-slump concrete requiring high-speed vibration, the VPP pneumatic poker range delivers high-performance centrifugal force. With compressed-air cooling and low maintenance, these pokers are said to be highly dependable even in the most remote locations.

The CP poker range is fully complemented by a wide selection of portable power sources. Mechanical pokers have a choice of gasoline or diesel drive units with rugged construction, rubber mountings to reduce vibration and noise, and quick-release couplings.

CP’s new concrete product line includes walk-behind screeds that provide a consistent, even surface without any guide or supporting tube. Equipped with reliable 2288 Honda engines, they offer reduced hand-arm vibration, with an easily-accessible ignition switch and throttle control for quick adjustments. The LBG 1200 hand-held screed provides surface vibration only; it is suitable for slabs of all types and concrete of all consistencies. Recommended for smaller slabs and medium-to-low slump concrete, the LBG 800 bull float screed provides deeper vibration and single-step levelling.

Screeding time, labour and transport costs can also be cut with the CP CombiForm lightweight, leave-in-place screed rail system. CombiForm is easily prepared and cast into the concrete, providing an efficient levelling solution.

CP’s STG power trowels are ideal where smoother finished surfaces are essential. The STG 24 is a small power float edger intended for smaller slabs and finishing edges, especially in confined spaces and by walls. STG 36 and 46 are higher capacity trowels designed for larger slabs.

Completing the range are concrete and asphalt floor saws that deliver a straight, stable cut for expansion joints, to a maximum depth of 15cm. They can also cut asphalt for road maintenance, or act as a jack hammer alternative.

For more information on companies in this article

Related Content

  • Canadian air
    February 8, 2012
    Compressors from Atlas Copco are proving highly useful in highly diverse applications, on a bridge project and a quarry in Canada. Water ingress over 30 years has damaged a road bridge in Quebec City, Canada, deteriorating the concrete and breaking down the rubber expansion joints at both ends of the 150m long structure. City highway authority, Transportes Quebec, awarded local contracting company Inter-Structures the contract to replace the deteriorated concrete and fit new membrane seals. The bridge, clos
  • Amey chooses polystyrene blocks for Scottish tunnel infill
    June 25, 2018
    Amey recently completed an infill project to make safe a disused railway tunnel underneath the approach roads north of Scotland’s Forth Road Bridge. The 420m tunnel was part of the Dunfermline to North Queensferry railway line that provided a link to the ferry service until the opening of the Forth Bridge in 1890. The 4.3m-wide and 5.1m-high tunnel with vaulted roof and brick lining continued in use for freight until 1954. The tunnel runs underneath the A9000 and B981 on the northern approach to the Forth
  • Durable light towers from Doosan
    February 21, 2022
    The Portable Power business of Doosan Bobcat has launched a new range of compact generators as well as the new LVL 50Hz portable light tower for markets in the Middle East and Africa
  • Peri delivers formwork for Fehmarnbelt Tunnel
    July 12, 2023
    The last of the 12 ships delivering Peri’s formwork recently arrived at the tunnel element factory east of Rødbyhavn on Denmark’s Lolland island.