Skip to main content

Cemex materials at Jamaican airport

Technology supplied by Cemex has helped repave taxiways at the International Sangster Airport in Montego Bay, Jamaica. The firm supplied a concrete plant, a paver, and other supplies from Mexico to guarantee the durability and quality of the airport’s facilities.
June 10, 2019 Read time: 2 mins

 

The team comprised Mexican and Jamaican professionals and worked with the control tower to complete the project without affecting the airport’s operations.

The team of specialists had the job of renovating 35,000m2 of taxiways at the airport. From Mexico, Cemex provided a specialist construction team, a concrete plant, materials that were not available in the area, and a sophisticated paver. The team used the equipment and materials to place 22,500m3 of concrete within the time schedule required.

The taxiways needed repaving due to the wear and tear caused by aircraft manoeuvring. Rubén Hernando Ceña, project manager of INECO, the company in charge of project supervision explained, "Concrete is a solution for safety improvement, reduces the risk of aircraft damage due to the irregularities of old pavement.”

With the equipment on site, CEMEX Mexico’s 30 specialists in pavement, maintenance, topography, quality, management, and control worked to complete the project without interrupting the airport’s operations. "The CEMEX team collaborated with the airport’s authorities to produce high resistance concrete and execute the project without affecting air traffic," explained Alejandro Vares, Infrastructure and Government vice president of CEMEX Mexico.

With the project completed in less than six months, the new taxiway´s lifespan will extend up to 20 years; a change that will reduce maintenance frequency and benefit the airport’s 4.5 million annual users.

The international project was led by a Mexican team from CEMEX in collaboration with CEMEX Jamaica and Caribbean Cement, CEMEX’s local subsidiaries, and local builder S&G Road Surfacing Materials.

For more information on companies in this article

Related Content

  • Cost effective road maintenance
    February 8, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports. Road maintenance is an increasingly important industry that spans a worldwide market. Awareness of the need for a stable and sustainable international infrastructure, maintenance and creative rural road technologies are taking a stronger role as viable sources for a cost-effective means of preserving, developing and prolonging the life of roads wit
  • Beyond cost: forging a solutions-led partnership for highways carbon-saving
    December 30, 2024
    Changing highways procurement is increasingly focusing material specification to drive carbon savings as well as cost. A longstanding partnership between Huyton Asphalt and Tarmac is delivering new solutions for highways clients in the UK.
  • Cold recycling helps rebuild of Brazil’s Ayrton Senna highway
    September 28, 2015
    Brazil’s Ayrton Senna Highway has been rebuilt using cold recycling. Brazil’s SP-070 is also known as the Ayrton Senna Highway and is a major highway in the country, carrying heavy traffic volumes. For its rebuild, the time-saving, cost-efficient and eco-friendly benefits of the cold recycling process have been put to the test. The SP-070 provides a key transport link between São Paulo and Campos do Jordão, Vale do Paraíba and Rio de Janeiro, as well as being the main access route to Guarulhos Interna
  • Asphalt resurfacing at Miami International Airport
    February 8, 2012
    Improvements worth US$30 million are being carried out at Miami International Airport. The work includes runway resurfacing with specialist contractors having been brought in to handle the project. This is a busy facility handling some 34 million passengers/year and the work is being carried out over a period of 454 days in all, starting in September 2009 and due to finish in December 2010. The focus of attention is the upgrade to the airport's second longest runway, 8R 26L as well as the adjoining M and N