Skip to main content

Cemex materials at Jamaican airport

Technology supplied by Cemex has helped repave taxiways at the International Sangster Airport in Montego Bay, Jamaica. The firm supplied a concrete plant, a paver, and other supplies from Mexico to guarantee the durability and quality of the airport’s facilities.
June 10, 2019 Read time: 2 mins

 

The team comprised Mexican and Jamaican professionals and worked with the control tower to complete the project without affecting the airport’s operations.

The team of specialists had the job of renovating 35,000m2 of taxiways at the airport. From Mexico, Cemex provided a specialist construction team, a concrete plant, materials that were not available in the area, and a sophisticated paver. The team used the equipment and materials to place 22,500m3 of concrete within the time schedule required.

The taxiways needed repaving due to the wear and tear caused by aircraft manoeuvring. Rubén Hernando Ceña, project manager of INECO, the company in charge of project supervision explained, "Concrete is a solution for safety improvement, reduces the risk of aircraft damage due to the irregularities of old pavement.”

With the equipment on site, CEMEX Mexico’s 30 specialists in pavement, maintenance, topography, quality, management, and control worked to complete the project without interrupting the airport’s operations. "The CEMEX team collaborated with the airport’s authorities to produce high resistance concrete and execute the project without affecting air traffic," explained Alejandro Vares, Infrastructure and Government vice president of CEMEX Mexico.

With the project completed in less than six months, the new taxiway´s lifespan will extend up to 20 years; a change that will reduce maintenance frequency and benefit the airport’s 4.5 million annual users.

The international project was led by a Mexican team from CEMEX in collaboration with CEMEX Jamaica and Caribbean Cement, CEMEX’s local subsidiaries, and local builder S&G Road Surfacing Materials.

For more information on companies in this article

Related Content

  • Successful resurfacing at New York's JFK Airport
    February 8, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • Successful resurfacing at New York's JFK Airport
    May 3, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • Olbia Airport upgrade work
    September 16, 2020
    Equipment from the Fayat Group has played an important role in the revamping of a busy airport on the Italian island of Sardinia
  • Airport's high demands on asphalt and concrete techniques
    July 11, 2012
    Airport runway, taxiway and parking areas make high demands on paving requirements, both with concrete and asphalt techniques. Mike Woof reports. High quality surface finishes are required in airport environments for runways, taxiways and aircraft parking areas. Because of the speed at which aircraft take off and land and the massive forces exerted due to the weight of the aircraft, particularly during landing, runway structures need to be incredibly strong. The surfaces also have to be constructed to very