Skip to main content

Bridge work is no problem for Terex concrete paver Bid-Well 3600

Terex says that its Bid-Well 3600 automatic paver roller is flexible enough to deliver high-quality paving for both slab-on-grade and bridge applications. Meeting a variety of inline paving and skewed bridge designs, the 3600 paver offers standard paving width configurations from 2.4-26.2m with on-the-fly paving widths changes of up to 9.1m. It quickly adapts to the contractor’s bridge deck placement and slab-on-grade paving needs. Kraemer North America recently used an MLC300 to help replace an 84-ye
May 30, 2018 Read time: 2 mins
A barge-mounted Manitowoc MLC300 at work on the new 750m-long Dale Gardner Veterans Memorial Bridge in Illinois
1222 Terex says that its Bid-Well 3600 automatic paver roller is flexible enough to deliver high-quality paving for both slab-on-grade and bridge applications.

Meeting a variety of inline paving and skewed bridge designs, the 3600 paver offers standard paving width configurations from 2.4-26.2m with on-the-fly paving widths changes of up to 9.1m. It quickly adapts to the contractor’s bridge deck placement and slab-on-grade paving needs.

Available inserts transition paver frame depth from 914-1,219mm at the centre to extend paving widths to 33.5m. For paving skewed bridge decks, the 3600 has a universal power crown adjuster that can be set for paving inline or offset to an adjacent hinge point opposite the other for quickly adjusting the crown when paving at a skew.

Terex says that the machine’s legs adapt to meet any challenge thanks to powered leg-height adjustments of up to 1,168mm. For paving at cross-slopes greater than 4%, the pivot leg configuration adjusts the paver to a true vertical operating position to reduce side forces placed on the rail and eliminate additional shoring. The swing-leg design delivers zero-clearance paving when working in tight applications, such as rehabilitation work and deck overlays.

Its available six-wheel-bogie leg option spreads machine weight over a wider area to lessen the load on the overhang brackets.

Meanwhile, new orange strobe lights positioned at the corners of the paver’s frame alert workers and nearby traffic when the machine is paving to enhance operating safety.

The integrated Terex Bid-Well LED lighting system decreases the harsh shadows thrown by tower lights, allowing finishers to deliver a high-quality final product. Up to 12 LED lights can be positioned anywhere on the machine. Up to four lights can be mounted directly onto the paving carriage to illuminate the paver.

The 3600 paver’s carriage incorporates a segmented upper and lower section to

For more information on companies in this article

Related Content

  • Compaction review: cutting edge updates
    June 21, 2024
    An array of innovative asphalt compaction machines are now coming to market from several of the major manufacturers.
  • Istanbul’s new airport benefits from Wirtgen Group machines
    November 22, 2017
    Construction of Istanbul’s new airport facility is benefiting from the use of a large fleet of machines from the Wirtgen Group. When it is complete, this will be the world’s largest airport and will be able to handle 150-200 million passengers/year as well as 6 million tonnes of freight/year. This will make the facility substantially larger than the world’s current largest airport, the Hartsfield-Jackson Atlanta International Airport, which handles around 105 million passengers/year.
  • Asphalt paver proven in tough applications
    February 16, 2012
    BOMAG says that its new BF800 paver has now been well proven in tough working applications.
  • Asphalt paver proven in tough applications
    April 10, 2012
    BOMAG says that its new BF800 paver has now been well proven in tough working applications. The newly developed BF800 follows the same basic design principles of the smaller BF300 and BF600 models and weighs in at 20tonnes, with a maximum screed width of 2.5-10m. Extensive testing of the BF800 was carried out in an array of difficult operations and in late 2010 some 14,000tonnes of asphalt was laid in 3.5 days in 24-hour shifts to reconstruct the Brenner highway on the A22 near Bozen in northern Italy.