Skip to main content

Quick concrete repair to airport facilities

Riga International Airport in Latvia is seeing growth in aircraft numbers and passengers, prompting a need for investment and upgrades.
April 10, 2012 Read time: 1 min
RSSRiga International Airport in Latvia is seeing growth in aircraft numbers and passengers, prompting a need for investment and upgrades. The number of passengers in May 2011 showed an increase of 12% to 478,423 compared to May 2010. With hundreds of flights leaving daily some concrete needed repairing at the airport. Construction Projects Manager at Riga International Airport, Guntis Skangalis opted to use Ultrascape Pro-Prime Slurry Primer and Ultracrete FTC High Strength Concrete Repair for the completion of the project. This followed a presentation held by 2819 Delta Urban, distributors of Ultracrete Highway Maintenance and Ultrascape Streetscape materials. Once the damaged concrete had been prepared using a hydraulic hammer, Ultrascape Pro-Prime Slurry Primer was applied. Ultracrete FTC High Strength Concrete Repair was then prepared. The project was completed on time and with minimum disruption to passengers and employees.

For more information on companies in this article

Related Content

  • Maputo Airport runway rebuild
    March 26, 2019
    Rebuilding work has been carried out on the runway and taxiways at Maputo International Airport in Mozambique. The work was carried out for Aeroportos de Moçambique, with the engineering handled by NACO and US$64 million of funding being suplied by Agence Française de Dévelopement.
  • Cold recycling helps rebuild of Brazil’s Ayrton Senna highway
    September 28, 2015
    Brazil’s Ayrton Senna Highway has been rebuilt using cold recycling. Brazil’s SP-070 is also known as the Ayrton Senna Highway and is a major highway in the country, carrying heavy traffic volumes. For its rebuild, the time-saving, cost-efficient and eco-friendly benefits of the cold recycling process have been put to the test. The SP-070 provides a key transport link between São Paulo and Campos do Jordão, Vale do Paraíba and Rio de Janeiro, as well as being the main access route to Guarulhos Interna
  • New tests, new technology, new users: why materials testing is a growing market
    February 7, 2017
    A look back at some of the developments this year, and a look ahead to what may come next reveals the increasing use of materials testing. New technology and new ways to process and analyse data will drive change even further - Kristina Smith reports For materials testing equipment manufacturers, constant change is business as usual. New tests emerge, new standards are written and new practices spread around regions and the world. There are also new materials to deal with: bitumen modified with polymers
  • Kosovo's award-winning green highway construction
    March 20, 2012
    A new highway is proving an economic lifeline for the tiny country of Kosovo – Mike Woof reports. Road projects in Europe rarely meet such widespread public approval and support as the new Route 7 highway being built in the new Balkan state of Kosovo. The first sections of the new road opened to traffic in November 2011, with locals turning out in large numbers to celebrate the event. The official opening was carried out by the country’s prime minister Hashim Thaçi, president Atifete Jahjaga, and members of