Skip to main content

Quick concrete repair to airport facilities

Riga International Airport in Latvia is seeing growth in aircraft numbers and passengers, prompting a need for investment and upgrades.
April 10, 2012 Read time: 1 min
RSSRiga International Airport in Latvia is seeing growth in aircraft numbers and passengers, prompting a need for investment and upgrades. The number of passengers in May 2011 showed an increase of 12% to 478,423 compared to May 2010. With hundreds of flights leaving daily some concrete needed repairing at the airport. Construction Projects Manager at Riga International Airport, Guntis Skangalis opted to use Ultrascape Pro-Prime Slurry Primer and Ultracrete FTC High Strength Concrete Repair for the completion of the project. This followed a presentation held by 2819 Delta Urban, distributors of Ultracrete Highway Maintenance and Ultrascape Streetscape materials. Once the damaged concrete had been prepared using a hydraulic hammer, Ultrascape Pro-Prime Slurry Primer was applied. Ultracrete FTC High Strength Concrete Repair was then prepared. The project was completed on time and with minimum disruption to passengers and employees.

For more information on companies in this article

Related Content

  • Surface testing
    March 1, 2012
    PipeHawk has used its sophisticated ground probing radar (GPR) technology to develop the e-Spott system for the highways sector. The e-Spott package has been designed and developed in collaboration with another GPR specialist, Utsi Electronics. This new system is said to provide a fast and reliable method of testing the total thickness of bound layers to the sub-base interface or the thickness of surface concrete. This system has advantages over traditional coring methods as there is no need to cause disrup
  • New dual carriageway for South East Nigeria
    March 11, 2015
    Work is nearing completion on Nigeria’s important East-West road project. The new dual carriageway link should be ready to carry traffic in a matter of months. In all the project was originally expected to cost in the order of US$1.93 billion to construct and work commenced back in 2006. However an additional stretch may now be added that will extend the route. This project is of significance as it improves transport links to the South East of Nigeria, an area of the country that has long been overlooked fo
  • Costa Rica concrete repairs
    February 15, 2012
    Work has started on the long awaited San Jose-Caldera Highway in Costa Rica, following numerous delays and setbacks. The new 77.5km highway will be used daily by more than 81,000 vehicles, reducing the travel time between the Central Valley and the Central Pacific Coast by at least 30 minutes.
  • Big production
    March 14, 2012
    High quality standards and high quality equipment have led to one company building a strong market share in a part of the US with high requirements on finish. The Pavement Maintenance Division of American Asphalt and Grading is based in Las Vegas, Nevada, but is highly active right across the states of California, Utah, Nevada and Arizona. This operation is run by Eric Reimschiissel and was established as a division from the parent company in 2001 and has since grown to have two paving/patching crews, two s