Skip to main content

Quick concrete repair to airport facilities

Riga International Airport in Latvia is seeing growth in aircraft numbers and passengers, prompting a need for investment and upgrades.
April 10, 2012 Read time: 1 min
RSSRiga International Airport in Latvia is seeing growth in aircraft numbers and passengers, prompting a need for investment and upgrades. The number of passengers in May 2011 showed an increase of 12% to 478,423 compared to May 2010. With hundreds of flights leaving daily some concrete needed repairing at the airport. Construction Projects Manager at Riga International Airport, Guntis Skangalis opted to use Ultrascape Pro-Prime Slurry Primer and Ultracrete FTC High Strength Concrete Repair for the completion of the project. This followed a presentation held by 2819 Delta Urban, distributors of Ultracrete Highway Maintenance and Ultrascape Streetscape materials. Once the damaged concrete had been prepared using a hydraulic hammer, Ultrascape Pro-Prime Slurry Primer was applied. Ultracrete FTC High Strength Concrete Repair was then prepared. The project was completed on time and with minimum disruption to passengers and employees.

For more information on companies in this article

Related Content

  • New surface for Dubai’s busy airport
    January 6, 2015
    Dubai’s busy international airport is now benefiting from new runway and taxiway areas that will help boost capacity. The upgrades are much needed as the airport is one of the world’s busiest in terms of international flights. Data from the International Air Transportation Association (IATA) says that in 2013, air passenger traffic worldwide topped 3.1 billion, and demand is expected to continue to grow. The combination of more flights and growing numbers of larger and more sophisticated aircraft like the A
  • Efficient construction leads to quality roads
    November 30, 2012
    Technology to assist the installation of quick laying, yet top-quality, road surfaces requiring less frequent repair, thus limiting costs and the number of construction sites, is being sought by highways authorities the world over. The European Union devised project ASPHALT (Advanced Galileo Navigation System for Asphalt Fleet Machines) for satellite navigation and fleet management may have found just what such authorities are looking for. Within the scope of the ASPHALT research project MOBA, together wit
  • Lafarge picks up Vancouver runway deal
    January 24, 2025
    Lafarge Canada will be a subcontractor to Kiewit and in charge of asphalt paving for Vancouver International’s North Runway project.
  • Act FAST when it comes to bridge maintenance, argues Cliff Weston
    February 27, 2017
    Deck waterproofing remains critical to a bridge’s structural integrity for its design life, explains Cliff Weston, director of Stirling Lloyd To properly maintain deck waterproofing there must be a willingness to look at solutions based on whole-life costing rather than just short-term initial costs. There are lessons to be learned from examples of prematurely failed infrastructure due to a focus on initial short-term costs.