Skip to main content

Quick concrete repair to airport facilities

Riga International Airport in Latvia is seeing growth in aircraft numbers and passengers, prompting a need for investment and upgrades.
April 10, 2012 Read time: 1 min
RSSRiga International Airport in Latvia is seeing growth in aircraft numbers and passengers, prompting a need for investment and upgrades. The number of passengers in May 2011 showed an increase of 12% to 478,423 compared to May 2010. With hundreds of flights leaving daily some concrete needed repairing at the airport. Construction Projects Manager at Riga International Airport, Guntis Skangalis opted to use Ultrascape Pro-Prime Slurry Primer and Ultracrete FTC High Strength Concrete Repair for the completion of the project. This followed a presentation held by 2819 Delta Urban, distributors of Ultracrete Highway Maintenance and Ultrascape Streetscape materials. Once the damaged concrete had been prepared using a hydraulic hammer, Ultrascape Pro-Prime Slurry Primer was applied. Ultracrete FTC High Strength Concrete Repair was then prepared. The project was completed on time and with minimum disruption to passengers and employees.

For more information on companies in this article

Related Content

  • Patching potholes on a highway and runway
    February 13, 2017
    Ultracrete products have been used to tackle two difficult pothole patching problems, at Santiago’s busy airport in Chile and on a coastal highway on the island of Reunion.
  • Rapid setting bedding mortar
    February 16, 2012
    Horizon Paving is now the exclusive licensee in New Zealand for Ultrascape mortar paving range and is starting production of the Ultrascape Pro-Bed HS bedding mortar. The Ultrascape mortar paving range consists of Pro-Bed HS fine bedding mortar, Pro-Prime slurry primer, Flowpoint rapid set flowable grout, and Cempoint gun injected mortar. Joint Fix sand stabiliser and surface sealer and EP-R9 epoxy resin mortar complement the products.
  • Paving a Japanese airport within strict time constraints
    September 19, 2012
    In Japan, major efforts are being made to both conserve energy and materials, while also delivering high quality airport runways. At Haneda Airport, as well as at the Fukuoka, Chitose and Sendai airports, innovative use is being made of asphalt paving equipment from Sumitomo. The latest model HA60W J paver from Sumitomo is being used to lay warm mix asphalt, while the contractors is also using sophisticated control technology. To minimise disruption to flight schedules, construction work at Haneda has been
  • Successful resurfacing at New York's JFK Airport
    May 3, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.