Skip to main content

England cements concrete repair contracts

Highways England has awarded concrete upgrade work to AECOM and Atkins.
By David Arminas January 20, 2021 Read time: 2 mins
Most of England’s concrete roads were built in the 1960s and 1970s

Highways England has awarded the first of three major contracts to revitalise concrete road surfaces across the country.

Over the next four years, Highways England will work with infrastructure and engineering companies AECOM and Atkins to provide design, supervision and project management services on a nationwide programme to repair or replace the concrete surface of a number of motorways and major A roads.

The project is part of Highways England’s Road Investment Strategy €450 million (£400 million) commitment to improve the quality of 965km of existing concrete roads, with this Design Framework contact worth €44 million (£39 million) being the first of three major contracts to be award this year.

Most of England’s concrete roads were built in the 1960s and 1970s and are now past their design life as well as carrying up to 25 per cent more traffic than for which they were designed. The roads are in need of vital upgrades, according to Highways England, the government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

Some surfaces will be repaired to extend their life and others will be fully replaced, said Martin Fellows, Highways England regional director.

“The framework [contract] gives us the opportunity to build on work already underway… by using innovative digital assessments to measure the technical and customer benefits for concrete surface treatments,” said Ian Spellacey, client director for strategic highways with Atkins.

Highways England said it will award two more contacts this year under the Concrete Roads Programme. The first be for lifecycle extension works, a contract worth around €75.3 million (£67 million).

The final contract is the Concrete Roads Reconstruction Framework – worth €245 million (£218 million) across four years. It will cover demolish concrete surfaces and pouring replacement concrete surfaces.

Highways England has also established a national centre of excellence under their Concrete Roads Programme. It will be a focal point for regional schemes to establish a standardised approach and ensure consistency of delivery across England.

For more information on companies in this article

Related Content

  • Epiroc looks to the future following resilient 2020 trading
    March 12, 2021
    Epiroc CEO and president Helena Hedblom said the Swedish mining, quarrying and construction equipment manufacturer is well placed for good business in 2021 after resilient trading during a heavily COVID-19 disrupted 2020.
  • How waste plastic and soybean oil are helping our roads last longer
    April 13, 2018
    A new super-modifier is born from waste plastic in Italy and a soybean-based rejuvenator from the US spreads from its home market. By Kristina Smith The two bitumen technologies featured this month come from almost opposing sources. One emerges from the human-created plastic waste plaguing our planet, the other from a plant. However, both technologies have been created with the same aims: to increase the life of roads, saving cost and ultimately reducing the impact of road building on the planet. A coll
  • AtkinsRéalis for Georgia transport resilience
    June 25, 2024
    AtkinsRéalis will develop strategies that integrate vulnerability assessment results into asset management systems with the goal of protecting the US state’s transportation network.
  • Global credit squeeze impacts Australia's road construction
    July 13, 2012
    Roads Australia steps up in policy debate as road construction feels the pinch of the credit squeeze, as Mark Bowmer (RA media director) reports Like all markets around the world, Australia is feeling the effects of the global credit squeeze and its impact on the delivery of major infrastructure projects such as roads. In Sydney, for example, lack of funding (both from government and private sources) is seen as the major stumbling block to the construction of a much-needed eastern extension to Sydney's main