Skip to main content

England cements concrete repair contracts

Highways England has awarded concrete upgrade work to AECOM and Atkins.
By David Arminas January 20, 2021 Read time: 2 mins
Most of England’s concrete roads were built in the 1960s and 1970s

Highways England has awarded the first of three major contracts to revitalise concrete road surfaces across the country.

Over the next four years, Highways England will work with infrastructure and engineering companies AECOM and Atkins to provide design, supervision and project management services on a nationwide programme to repair or replace the concrete surface of a number of motorways and major A roads.

The project is part of Highways England’s Road Investment Strategy €450 million (£400 million) commitment to improve the quality of 965km of existing concrete roads, with this Design Framework contact worth €44 million (£39 million) being the first of three major contracts to be award this year.

Most of England’s concrete roads were built in the 1960s and 1970s and are now past their design life as well as carrying up to 25 per cent more traffic than for which they were designed. The roads are in need of vital upgrades, according to Highways England, the government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

Some surfaces will be repaired to extend their life and others will be fully replaced, said Martin Fellows, Highways England regional director.

“The framework [contract] gives us the opportunity to build on work already underway… by using innovative digital assessments to measure the technical and customer benefits for concrete surface treatments,” said Ian Spellacey, client director for strategic highways with Atkins.

Highways England said it will award two more contacts this year under the Concrete Roads Programme. The first be for lifecycle extension works, a contract worth around €75.3 million (£67 million).

The final contract is the Concrete Roads Reconstruction Framework – worth €245 million (£218 million) across four years. It will cover demolish concrete surfaces and pouring replacement concrete surfaces.

Highways England has also established a national centre of excellence under their Concrete Roads Programme. It will be a focal point for regional schemes to establish a standardised approach and ensure consistency of delivery across England.

For more information on companies in this article

Related Content

  • Busy UK motorway junction demolished in tight time frame – Mark Anthony reports
    October 18, 2012
    Military-style planning and overwhelming demolition firepower ensured that Armac Group avoided financial penalties and the wrath of drivers on one of the UK’s busiest motorway intersections. Demolition & Dismantling reports. 6 January is traditionally known for the visit of the three wise men to Bethlehem. However, on 6 January 2012, three wise demolition engineers from Armac Group was tasked with dismantling the monumental structure known as Catthorpe Viaduct: the main overbridge of the M6/M1/A14 interc
  • UK DfT appoints four consortia to road and rail consultancy framework
    April 25, 2012
    Four consortia have been appointed by the DfT to consultancy frameworks for rail and road schemes. A TRL-Halcrow joint venture; Ove Arup & Partners with URS; Aecom and Atkins; and Parsons Brinckerhoff with WSP; may be used by the DfT, Highways Agency or any other Government bodies, over a period of three years with the potential for a one-year extension. Similar plans for general transport and social research are underway, although the tender was suspended in 2011 as it was thought to disadvantage smalle
  • Long life asphalt paving reduces maintenance
    April 11, 2012
    Contractor FM Conway is working on a three year contract with Dover Harbour Board to reconstruct and resurface busy access routes and large vehicle parks within the port. One of the major factors for this contract being awarded was the company's strong green credentials. The contract is based around small and large individual paving projects within the Eastern Docks, which can range in time scales from three weeks to six months. The first phase of work, which started in early May, was to fully reconstruct
  • Long life asphalt paving reduces maintenance
    May 8, 2012
    Contractor FM Conway is working on a three year contract with Dover Harbour Board to reconstruct and resurface busy access routes and large vehicle parks within the port. One of the major factors for this contract being awarded was the company's strong green credentials. The contract is based around small and large individual paving projects within the Eastern Docks, which can range in time scales from three weeks to six months. The first phase of work, which started in early May, was to fully reconstruct