Skip to main content

Electric slipforming with machine control

Electric slipforming has been carried out with machine control technology from Leica Geosystems.
By MJ Woof September 4, 2024 Read time: 1 min
Roos Groep and Leica Geosystems have come together to deliver electric slipforming with machine control technology

Leica Geosystems, part of Hexagon, and Roos Groep a specialist in road construction are trialling the world’s first fully electric slipform paver, guided by Leica Geosystems’ 3D machine control solution.  

Roos Groep has collaborated with partners to create an emission-free slipform paver that integrates cutting-edge technologies. This machine enables fossil fuel-free operations while prioritising safety and ergonomics.   

Roos Groep decided to boost the productivity of the electric slipform paver by integrating Leica Geosystems’ MC1 3D machine control solution. The system features which include dual GNSS for heading and a total station for precise height control, ensure millimetre accuracy and simplified installation. Utilising machine control on top of a zero-emission slipform paver reduces operational downtime and optimises energy efficiency, maximising its environmental and performance benefits.  

In addition to Leica Geosystems providing a 3D machine control systems, key collaborators included Statec for design and drafting, Staad-Fusion for batteries, Hightide for hydraulic components, Hydrocan Engineering for automation and Degra for electro-hydraulic components. Structural elements were provided by TJP Bladel and Van de Brand Metaal, with Ingenieursbureau Van Asseldonk offering advisory services and CE certification. 

For more information on companies in this article

Related Content

  • ULMA's complete climbing solutions
    June 1, 2021
    ULMA's complete climbing solutions provides forming, climbing, and safety in a single product line
  • New Bocimi Toll Road Aims to Reduce Travel Time and Boost Indonesia’s Economy
    April 20, 2023
    The Bogor-Ciawi-Sukabumi (Bocimi) toll road is a series of national strategic projects to help reduce traffic congestion along the existing factory-lined roadway, as well as enhance regional connectivity and tourism in West Java. Spanning 54 kilometers, the new highway corridor is expected to shorten travel time between the Bogor and Sukabumi provinces from two hours to 30 minutes and boost economic conditions in the surrounding Sukabumi area. Construction is divided into four phases, the first of which measures 15.35 kilometers and is already complete. PT Waskita Karya (Waskita) is the main contractor for the IDR 2.1 trillion second section, spanning 11.9 kilometers between Cigombong and Cibadak, and set for completion in 2023 after being delayed due to the pandemic.
  • Brussels road tunnel project complete
    March 1, 2022
    Construction work is complete on a key Brussels road tunnel project.
  • Cat® mid-sized asphalt pavers: compact size, simple operation, more flexibility for urban and rural jobs
    April 4, 2024
    The new Cat Mid-Sized Asphalt Pavers (AP400, AP455, AP500 & AP555) offer contractors more opportunities to pave both urban and rural applications. Their compact size and small footprint provide exceptional manoeuvrability in tight spaces like narrow streets and small car parks, yet, when equipped with extensions it delivers a wide paving range for rural roads and wide streets.