Skip to main content

Egypt’s new concrete highway connecting Cairo with Sues

CEMEX has played a key role in a highway construction job in Egypt. The company has supplied 130,000m3 of concrete that has been used for the construction of the new Cairo–Suez highway project. The project is of note as this is Egypt’s first concrete highway and if it proves successful, more are likely to be built using this construction method. The 35km road is of major importance to Egypt also as it connects the capital, Cairo, with the seaport city of Suez, two of the nation’s most important economic cen
July 15, 2016 Read time: 1 min


Related Content

  • Chile’s new urban highway link
    May 2, 2022
    Nestling in a valley beside the Andes mountain range, Santiago has a growing population and has suffered from increasingly heavy congestion in recent years, requiring a new urban road link for which safety has been set as a priority for drivers - *iRAP reports
  • New route for UAE highway project
    October 19, 2016
    Work on a new road project worth US$102.6 million is now underway. In all the highway will be 140km long, connecting Al Faya, Razeen and Al Quaa. The work is being carried out by contractor Musanada. The project is being carried out in two stages, with the 88km stretch from Al Faya to Razeen and a 52km stretch from Razeen to Al Quaa.
  • New northern highway link for Pakistan
    September 23, 2014
    Pakistan is planning a project to construct a new northern highway connecting Havelian and Hassanabdal. The loans required to finance the project have been signed by both the government of Pakistan and the Asian Development Bank (ADB). The Havelian-Hassanabdal (Burhan) Expressway (E-35) project is for a north-south access controlled highway. This new link will connect the existing highway network with north Pakistan and the associated construction contracts are worth some US$200 million in all.
  • New highway for Russia’s north west
    December 16, 2014
    In the north west of Russia, plans are in hand for a new highway project. The 80km highway is expected to cost US$172 million. The tender process is now underway and 40km of the highway is to be offered under a concession package. This section of the Syktyvkar - Naryan-Mar (the Nenets Autonomous Area, North-West) highway will be built in the Komi Republic. Construction of the highway is planned to commence in 2015, with completion expected in 2018.