Skip to main content

Concrete highway linking Mexico with US

A new concrete surface has been constructed along the busy Monterrey-Nuevo Laredo highway in Mexico. This route is of prime importance both for Mexico and its neighbour, the US, as it is the main export-import route between the two countries. Located in northeast Mexico, the Monterrey-Nuevo Laredo highway connects Mexico with the state of Texas in the United States. The route carries 52% of Mexico’s imports and exports and is crucial to the country’s economy, as well as for that of the US. CEMEX Mexic
March 17, 2016 Read time: 2 mins
A concrete surface is now a feature of the busy Monterrey-Nuevo Laredo highway in Mexico
RSSA new concrete surface has been constructed along the busy Monterrey-Nuevo Laredo highway in Mexico. This route is of prime importance both for Mexico and its neighbour, the US, as it is the main export-import route between the two countries.

Located in northeast Mexico, the Monterrey-Nuevo Laredo highway connects Mexico with the state of Texas in the United States. The route carries 52% of Mexico’s imports and exports and is crucial to the country’s economy, as well as for that of the US.

3016 CEMEX Mexico contributed to the restoration of the route, which had become severely deteriorated since it was last repaired. The high percentage of heavy trucks using the route had worn out the road surface leaving it in poor condition.

With more than 15,000 truckloads flowing across this highway daily, its repair required durable construction materials that guarantee road safety. The Mexican authorities opted to reconstruct the route with a concrete surface and CEMEX Mexico supplied 98,000m3 of hydraulic concrete to restore a 15.6km stretch of the highway that was in particular need of attention.

This new hydraulic concrete surface has provided a flat, high stiffness-bearing surface that will allow vehicles to travel safely on the Monterrey-Nuevo Laredo route. This concrete maintains its stiffness over time and is able to support higher volumes of traffic and loads than other surface types. In addition, concrete paving features high durability and requires minimum maintenance.

CEMEX Mexico was able to resurface the road without stopping traffic during peak periods. Different work shifts were employed to minimise the potential effect on the busy highway and ensure correct placement of the concrete.

This project required the transportation of more than 30,000tonnes of cement over winding sections of highway and directly employed more than 100 people.

For more information on companies in this article

Related Content

  • Developments in concrete road construction
    February 7, 2012
    Innovative developments are pushing forward concrete road construction techniques. The concrete road sector looks to benefit from some key innovations and developments now coming to market or being employed in different territories. Irregular weather and environmental conditions can alter the rate at which concrete cures, with a risk of plastic shrinkage cracks that can compromise the integrity of a pavement. Contractors cannot control the environmental conditions of a paving project and when weather patter
  • Concrete paving a smoother surface using machine control technology
    May 17, 2017
    Innovative technology has been used to deliver a smooth concrete road surface on a busy stretch of highway in Nebraska. Much-needed work on a busy section of Interstate 80 has been carried out in Nebraska to improve the road surface. This is one of the most important highways in the US, providing a link that stretches right across the country between the east and west coasts. This busy highway carries a high percentage of heavy truck traffic as it is a vital transport route. However this constant flow of la
  • Road link upgrade in Costa Rica
    January 5, 2017
    A key road in Costa Rica has been upgraded and now features concrete construction CEMEX Latam Holdings, a subsidiary of CEMEX, supplied the cement needed for the project to upgrade a 50km stretch of the Inter-American Highway in Costa Rica.
  • Upgrade due for Nicaragua’s NIC 3 highway
    September 11, 2013
    Nicaragua’s Ministry of Transportation and Infrastructure has awarded the first of a series of contracts to upgrade the NIC 3 highway. The construction work will be carried out by a consortium comprising contractors Constructora Meco, CEMEX and Llansa Ingenieros. This first phase will be for a 34.4km section of the route while the second stretch will be 15.6km long. In all the work is expected to take 18 months to complete and is likely to cost around US$40 million. Financing is being provided by the Fund o