Skip to main content

Wirtgen machines at Beijing’s new airport

Slipform pavers from Wirtgen have played important roles for the Beijing New International Airport project. The four Wirtgen slipform pavers have been used for the construction of the apron area for the new Chinese airport.
June 10, 2019 Read time: 2 mins
Designed for over one flight movement per minute: the traffic areas need to withstand high loads

The airport is scheduled to start operations on September 30th, 2019 and when it is complete, Beijing New International Airport will become be the world's largest airport. The huge new facility will play a key transport role as Beijing is a major air passenger hub for Asia. The new airport is located 67km from China’s capital city, along the border to Hebei province. It will relieve pressure on the existing airport northeast of Beijing, currently the world’s second-largest in terms of passenger volume. The new airport is expected to handle 45 million passengers at first but will have a total capacity of 100 million.

W_photo_SP500_01227_PR.jpg
A fleet of Wirtgen slipform pavers has been used at Beijing New International Airport in Daxing to construct the apron area, with a parking capacity of 268 aircraft

Low temperatures of around 0°C during the cold winters in Beijing were one of the challenges the Beijing Sino-Aero Construction Engineering Co, team faced during the construction period of the large apron area. A total of four 2395 Wirtgen SP 500 slipform pavers were used for paving single-layer concrete slabs 5m wide and 420mm thick over fixed forms. Levelling and steering parameters were communicated to the Wirtgen machine control system using string-line sensors. To withstand the high aircraft loads, the concrete slabs have been reinforced by means of steel dowels. High productivity and machine availability meant that the strict daily production targets were achieved, allowing the tight timeline to be met.

Cost factors are important for large projects and when choosing an equipment fleet, a contractor has to consider several factors. Minimising manpower was one of the main criteria considered by Sino-Aero Construction Engineering. The firm concluded that the Wirtgen slipform pavers would meet the demands of the automated concrete paving work to be carried out.

The paving work was carried out within the necessary parameters, as scheduled. The paving mold slipformed the concrete, exceeding the required specifications. Electrical vibrators were used to provide the high-frequency vibrations needed for optimum compaction of the concrete during the slipforming work. And the oscillating beam and super-smoother then provided the required finish for the new pavement.

For more information on companies in this article

Related Content

  • Paving a Japanese airport within strict time constraints
    September 19, 2012
    In Japan, major efforts are being made to both conserve energy and materials, while also delivering high quality airport runways. At Haneda Airport, as well as at the Fukuoka, Chitose and Sendai airports, innovative use is being made of asphalt paving equipment from Sumitomo. The latest model HA60W J paver from Sumitomo is being used to lay warm mix asphalt, while the contractors is also using sophisticated control technology. To minimise disruption to flight schedules, construction work at Haneda has been
  • Power Curbers ramps up Florida projects
    September 5, 2022
    A Florida company is using Power Curbers machines for major runway work in the US state.
  • EV charging infrastructure – what’s the future?
    November 14, 2022
    Road designers, construction companies and concessionaire firms will increasingly need answers about electric vehicle charging infrastructure and a new website is there to help – EV Charging and Infrastructure, evcandi.com - follows the latest news, technology and regulations.
  • Millimetre accuracy for concrete paving
    July 30, 2019
    Concrete paving is now benefiting from the use of sophisticated machine control tools to deliver accuracy and high-quality surfaces Heavy use of concrete roads and runways over time will reveal any flaws in workmanship, the invasion of water, or the wear from use. Discolouration, scaling, crazing, cracking, or curling will sometimes occur due to a poor ready-mix batch, inadequate curing procedure, subgrade settlement, or improper bonding of the finish layer. Concrete surfaces are generally very durab