Skip to main content

Versatile concrete paving machines

Concrete paving machines from Guntert & Zimmerman have been carrying out important surface repair jobs around the world. In Belgium a paver from the firm recently completed a high speed road repair, while at Qatar's New Doha International airport one of the firm's S850 units has carried out a major apron paving contract. The new airport is being designed to cope with large passenger aircraft such as the Airbus A380 and the Sinohydro-Gamuda-WCT joint venture was awarded the contract to build two runways, thr
July 13, 2012 Read time: 2 mins
Concrete paving machines from Guntert & Zimmerman have been carrying out important surface repair jobs around the world. In Belgium a paver from the firm recently completed a high speed road repair, while at Qatar's New Doha International airport one of the firm's S850 units has carried out a major apron paving contract. The new airport is being designed to cope with large passenger aircraft such as the Airbus A380 and the 5544 Sinohydro-2632 Gamuda-WCT joint venture was awarded the contract to build two runways, three taxiways and parking aprons. The aprons have been constructed from concrete and the contractor selected the G&Z S850 machine fitted with a compact dowel inserter for the job. The parking apron areas have to be paved to thicknesses of 400mm and 445mm and the site requires a total of some 226,525m3 in all of Pavement Quality Concrete. The project has not been straightforward as there are many obstacles with numerous in-slab obstacles of all shapes and sizes, while the paver has had to carry out short run jobs. There are 12 aprons spread out across the airport and moving the paver between each of these has not been easy as it has involved bypassing other work in progress. The paving has been carried out in 6m wide sections and the majority of the aprons are both transverse and longitudinal doweled. In all 375,000 dowel bars have been used and the job has required 190km of joint sealing. Eight of the aprons are 400mm thick while four are 445mm thick and the longest apron has a length of 900m. n


For more information on companies in this article

Related Content

  • Cost-saving benefits of dual layer asphalt paving
    February 14, 2012
    Sophisticated dual layer paving technologies currently on the market are said to offer major advantages to road builders. Roads built using twin layer, hot on hot paving techniques can last considerably longer than those constructed using conventional methods. Contractors and clients also stand to gain from savings on materials costs, through the elimination of the need for emulsion spraying between binder and wearing courses and with the use of thin layer wearing course designs. At present two paver man
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Wirtgen’s concrete paving business meets specialised market demands
    December 2, 2014
    Wirtgen is gearing up its operations in the concrete paving market - Mike Woof writes Concrete paving is a technology developed and pioneered in the US, so it is no surprise that US firms GOMACO, Guntert & Zimmerman, Power Curbers and Power Pavers, have had such a high profile in this market over the years. However one European firm, Wirtgen, is a serious competitor in the sector, the only non-US supplier to the market.
  • Innovative surface treatment for concrete road
    July 30, 2019
    An innovative surface treatment approach by Foster Contracting Limited has been developed for use on a £745million roads project in Aberdeen, Scotland. The specialist contractor, Foster Contracting Limited (FCL), has played a key role in a major project, to build the Aberdeen Western Peripheral Route/Balmedie-Tipperty (AWPR/B-T). AWPR Construction Joint Venture, the contractor appointed to design and construct the project, approached FCL to provide a customised treatment to remove the latency from the sl