Skip to main content

Versatile concrete paving machines

Concrete paving machines from Guntert & Zimmerman have been carrying out important surface repair jobs around the world. In Belgium a paver from the firm recently completed a high speed road repair, while at Qatar's New Doha International airport one of the firm's S850 units has carried out a major apron paving contract. The new airport is being designed to cope with large passenger aircraft such as the Airbus A380 and the Sinohydro-Gamuda-WCT joint venture was awarded the contract to build two runways, thr
July 13, 2012 Read time: 2 mins
Concrete paving machines from Guntert & Zimmerman have been carrying out important surface repair jobs around the world. In Belgium a paver from the firm recently completed a high speed road repair, while at Qatar's New Doha International airport one of the firm's S850 units has carried out a major apron paving contract. The new airport is being designed to cope with large passenger aircraft such as the Airbus A380 and the 5544 Sinohydro-2632 Gamuda-WCT joint venture was awarded the contract to build two runways, three taxiways and parking aprons. The aprons have been constructed from concrete and the contractor selected the G&Z S850 machine fitted with a compact dowel inserter for the job. The parking apron areas have to be paved to thicknesses of 400mm and 445mm and the site requires a total of some 226,525m3 in all of Pavement Quality Concrete. The project has not been straightforward as there are many obstacles with numerous in-slab obstacles of all shapes and sizes, while the paver has had to carry out short run jobs. There are 12 aprons spread out across the airport and moving the paver between each of these has not been easy as it has involved bypassing other work in progress. The paving has been carried out in 6m wide sections and the majority of the aprons are both transverse and longitudinal doweled. In all 375,000 dowel bars have been used and the job has required 190km of joint sealing. Eight of the aprons are 400mm thick while four are 445mm thick and the longest apron has a length of 900m. n


For more information on companies in this article

Related Content

  • G&Z pave the way as East meets West
    March 28, 2014
    The Silk Route is one of the oldest trading links between Europe and Asia and is being upgraded with some of the newest equipment. The nation of Georgia is located on what is known as the ‘crossroads’ between Western Asia and Eastern Europe. It lies to the east of the Black Sea and is on one of the shortest routes between western China and Europe. Since the Middle Ages this strategically important country has played host to one of the network of roads collectively known as the Silk Route. For much of the 20
  • A new runway surface for a major airport in Indonesia
    August 12, 2020
    Major rebuilding work has been carried out at Minangkabau International Airport (PDG), while the New Yogyakarta International Airport (NYIA) has been built in Indonesia.
  • Improved runway facility for Florida’s Fort Lauderdale Airport
    August 18, 2015
    Florida’s Fort Lauderdale- Hollywood International Airport (FLL) is now benefiting from an upgraded runway. A key portion of the work has been carried out using equipment from Minnich. The airport handles about 23 million passengers/year and with about 3 million of those from international flights, there was a need to develop the facility to cope with the larger aircraft used on international flights. The Broward County Aviation Department was responsible for the work and specified that the runway exp
  • Asphalt milling and paving with 3D control
    February 16, 2012
    Milling and paving repair operations for airport runways require particularly high tolerances, an obvious market for 3D control solutions writes Mike Woof. Airport runways require some of the most accurate quality standards and tightest tolerances of any asphalt or concrete surface. This is one area where the high precision capabilities of 3D systems offer clear advantages.