Skip to main content

Surfaces made safe

Spanning Manahawkin Bay, and carrying traffic along Route 72 between Long Beach Island and Manahawkin, New Jersey, USA, the Dorland J. Henderson Memorial Bridge, known as the Manahawkin Bay Bridge, was in need of repair. New Jersey Department of Transportation (NJDOT) specified Transpo T-17 MMA polymer concrete patch and T-18 MMA polymer concrete slurry overlay as approved materials for the 12,000m² bridge rehabilitation project on the steel girder bridge. All the bridge deck spalls were prepared and patche
April 4, 2012 Read time: 3 mins

Spanning Manahawkin Bay, and carrying traffic along Route 72 between Long Beach Island and Manahawkin, New Jersey, USA, the Dorland J. Henderson Memorial Bridge, known as the Manahawkin Bay Bridge, was in need of repair.

2555 New Jersey Department of Transportation (NJDOT) specified 350 Transpo T-17 MMA polymer concrete patch and T-18 MMA polymer concrete slurry overlay as approved materials for the 12,000m² bridge rehabilitation project on the steel girder bridge.

All the bridge deck spalls were prepared and patched before the entire surface received a thin T-18 MMA overlay. After the removal of the deteriorated existing concrete, T-41 MMA primer was applied to seal the concrete surface and increase the bond strength of the T-17 MMA polymer concrete patches to the existing concrete surface.

When the patching was completed the last operation was the installation of a thin 9.5mm T-18 MMA polymer concrete slurry overlay, and a high-wear and skid-resistant aggregate was broadcast onto the overlay surface. When cured the entire surface was coated with T-18 MMA topcoat to help lock the aggregate into the overlay.

1394 Ennis Prismo Traffic Safety Solutions’ new Fibrescreed RC100MTR crack repair product has passed the technical assessment for crack repair systems for highways under the BBA HAPAS scheme (British Board of Agrément Highways, Highway Authorities Product Approval Scheme).

The assessment means that the product is now approved for use on all major asphalt major roads, motorways and bridges in the UK.

While the approval is for recessed crack repair, Ennis Prismo manufactures a range of Fibrescreed products that can be used for practically all types of crack repair, including kerb sealing, infill, saw cut and seal/crack inducer and SAMI (stress absorbing membrane interlayer).

Fibrescreed RC100MTR is said to reduce costs by extending the life of existing highways without the need for resurfacing, and because it is fast and easy to apply, keeps costly traffic disruption to a minimum.

Meanwhile, 2314 Stirling Lloyd has developed a range of high performance road maintenance products to improve safety for the contractor and road user, and “offer superior in situ performance with a longer service life.” The company’s Safetrack Crack Infill, Safetrack Overbanding and Ultrajoint systems (bitumen-free, liquid, cold applied, fast-curing reactive resin systems for sealing and repairing cracks) are also HPAS Road and Bridges approved.

Stirling Lloyd says that the provision of safer and reliable traffic flows has become a matter of major concern for both the highway authorities and the road users.

“The need for reliable, long-term, safety enhancing road repairs with fast, first-time permanent reinstatement is becoming the driving force in highways maintenance,” says the company.

For more information on companies in this article

Related Content

  • Bitumen tech: innovation for decarbonisation
    June 4, 2024
    Kristina Smith examines four new products and processes, including bio-bitumen produced from algae, designed to lower the carbon footprint of asphalt mixes.
  • Specifying barriers correctly for optimum roadway safety
    April 29, 2015
    Mike Dreznes, executive vice president at the International Road Federation (IRF) discusses the proper utilisation of longitudinal barriers as a road safety priority Road authorities have a duty of care to ensure infrastructure not only meets safety requirements but provides protection for all road users. Crash barriers play an essential role in maximising safety, lowering the risk of sudden impact for road users and also allowing redirective capabilities.
  • PERI fills gap in Greek market
    February 19, 2013
    A team of Greek and German PERI engineers have developed a comprehensive formwork and scaffolding solution for the T4 bridge on the A7 motorway in Greece. The 160km long A7 connects Kalamata in the south to Corinth in the northwest of the Peloponnese peninsula. On one stretch of the motorway a 390m long arched bridge – known as T4 – is being used to close the gap between Paradisia and Tsakona. Set for completion in early 2014, two-thirds of the 22m wide bridge superstructure will be suspended on a steel arc
  • ERF organises successful road safety event
    May 31, 2013
    ERF organises successful event on Roadside Safety in cooperation with Transport Research Board. On 11 April, more than 90 participants from different parts of the world gathered in Brussels to attend the 2nd European Workshop of the TRB’s AFB 20 (2) Subcommittee on Roadside Safety. Coordinated by the European Union Road Federation and held at the CEN premises, the event proved a huge success. According to Konstandinos Diamandouros, ERF Head of Office and coordinator of the event, the feedback received from