Skip to main content

Surfaces made safe

Spanning Manahawkin Bay, and carrying traffic along Route 72 between Long Beach Island and Manahawkin, New Jersey, USA, the Dorland J. Henderson Memorial Bridge, known as the Manahawkin Bay Bridge, was in need of repair. New Jersey Department of Transportation (NJDOT) specified Transpo T-17 MMA polymer concrete patch and T-18 MMA polymer concrete slurry overlay as approved materials for the 12,000m² bridge rehabilitation project on the steel girder bridge. All the bridge deck spalls were prepared and patche
April 4, 2012 Read time: 3 mins

Spanning Manahawkin Bay, and carrying traffic along Route 72 between Long Beach Island and Manahawkin, New Jersey, USA, the Dorland J. Henderson Memorial Bridge, known as the Manahawkin Bay Bridge, was in need of repair.

2555 New Jersey Department of Transportation (NJDOT) specified 350 Transpo T-17 MMA polymer concrete patch and T-18 MMA polymer concrete slurry overlay as approved materials for the 12,000m² bridge rehabilitation project on the steel girder bridge.

All the bridge deck spalls were prepared and patched before the entire surface received a thin T-18 MMA overlay. After the removal of the deteriorated existing concrete, T-41 MMA primer was applied to seal the concrete surface and increase the bond strength of the T-17 MMA polymer concrete patches to the existing concrete surface.

When the patching was completed the last operation was the installation of a thin 9.5mm T-18 MMA polymer concrete slurry overlay, and a high-wear and skid-resistant aggregate was broadcast onto the overlay surface. When cured the entire surface was coated with T-18 MMA topcoat to help lock the aggregate into the overlay.

1394 Ennis Prismo Traffic Safety Solutions’ new Fibrescreed RC100MTR crack repair product has passed the technical assessment for crack repair systems for highways under the BBA HAPAS scheme (British Board of Agrément Highways, Highway Authorities Product Approval Scheme).

The assessment means that the product is now approved for use on all major asphalt major roads, motorways and bridges in the UK.

While the approval is for recessed crack repair, Ennis Prismo manufactures a range of Fibrescreed products that can be used for practically all types of crack repair, including kerb sealing, infill, saw cut and seal/crack inducer and SAMI (stress absorbing membrane interlayer).

Fibrescreed RC100MTR is said to reduce costs by extending the life of existing highways without the need for resurfacing, and because it is fast and easy to apply, keeps costly traffic disruption to a minimum.

Meanwhile, 2314 Stirling Lloyd has developed a range of high performance road maintenance products to improve safety for the contractor and road user, and “offer superior in situ performance with a longer service life.” The company’s Safetrack Crack Infill, Safetrack Overbanding and Ultrajoint systems (bitumen-free, liquid, cold applied, fast-curing reactive resin systems for sealing and repairing cracks) are also HPAS Road and Bridges approved.

Stirling Lloyd says that the provision of safer and reliable traffic flows has become a matter of major concern for both the highway authorities and the road users.

“The need for reliable, long-term, safety enhancing road repairs with fast, first-time permanent reinstatement is becoming the driving force in highways maintenance,” says the company.

For more information on companies in this article

Related Content

  • Volvo CE’s new L250H wheeled loader uses OptiShift to boost performance, safety and fuel economy
    January 6, 2017
    Volvo Construction Equipment’s new Tier 4 Final/Stage IV-compliant L250H wheeled loader has been designed to perform heavy tasks with better performance, safety and fuel economy levels using the manufacturer’s OptiShift technology. In North America the L250H is ideally suited to working with on-highway trucks, and the L250H will load a 22.7tonne tri-axle on-highway truck in just two passes. That’s two full buckets for one full truck says Volvo.
  • Volvo CE’s new L250H wheeled loader uses OptiShift to boost performance, safety and fuel economy
    March 7, 2014
    Volvo Construction Equipment’s new Tier 4 Final/Stage IV-compliant L250H wheeled loader has been designed to perform heavy tasks with better performance, safety and fuel economy levels using the manufacturer’s OptiShift technology. In North America the L250H is ideally suited to working with on-highway trucks, and the L250H will load a 22.7tonne tri-axle on-highway truck in just two passes. That’s two full buckets for one full truck says Volvo.
  • Asphalt reinforcement extends road life
    July 12, 2012
    Special reinforcements can extend the life of an old or new road, and also offer environmental benefits. Patrick Smith reports. Asphalt reinforcement can extend the service life of a resurfaced road by a factor of 3-4, says Huesker, developers of the HaTelit range of asphalt reinforcement. Aimed at preventing the propagation of reflective cracking from an old asphalt layer through a new surface course, Huesker claims the formation of reflective cracking is considerably delayed or even completely prevented u
  • Efficient road maintenance with Simex
    October 1, 2022

    Simex at Bauma Munich from 24 to 30 October, Hall C5, Booth 325.

    Bauma Munich – the most anticipated trade fair event in terms of strategic importance, turnout, new product launches and media impact for the earthmoving sector – has always been an opportunity for Simex to show to its partners and users its technical quality. The ability to innovate and do research, combining the new models in the range with new technological concepts, it’s the Simex way to outline the paths to be followed in the future.