Skip to main content

More Saudi airport capacity

A major expansion programme is underway at King Abdulaziz International Airport in Jeddah, Saudi Arabia. The work started in the third quarter of 2006 and is due for completion in 2015, with the construction activity being carried out in three main stages. Once the work is complete the airport will be able to handle up to 80 million passengers/ year, compared with 13 million/year before construction commenced. The project also includes three new terminal buildings and a high-speed rail link, as well as airf
October 12, 2012 Read time: 2 mins
An Sp500 slipform paver from Wirtgen is playing a major role in upgrading Jeddah airport in Saudi arabia

A major expansion programme is underway at King Abdulaziz International Airport in Jeddah, Saudi Arabia. The work started in the third quarter of 2006 and is due for completion in 2015, with the construction activity being carried out in three main stages. Once the work is complete the airport will be able to handle up to 80 million passengers/ year, compared with 13 million/year before construction commenced. The project also includes three new terminal buildings and a high-speed rail link, as well as airfield hard standing and paved areas, lighting, fuel network systems and storm water drainage network.

The project includes erecting a support services building, upgrades to the existing South and North Terminals and improvements to the existing runway and airfield systems so as to allow the airport to handle the larger Airbus A380 aircraft. Three new crescent-shaped passenger halls will be sited to the south of the current international terminal, itself benefiting from improvements. New road and rail links to the airport will also allow for improved passenger access to and from the site.

The phased increase in capacity will see the airport able to handle 30 million passengers/year at the end of the first stage, followed by 60 million/year at the end of the second stage and reaching the final 80 million/year once the work is complete.

The work is being carried out so as to allow aircraft movements to continue without interruption.

Related Content

  • GPS control delivers more accurate compaction performance
    July 13, 2012
    The latest compaction technology offers users the benefits of more accurate performance by combining heat detection and compaction metering with GPS In Europe several leading manufacturers now offer more accurate compaction technology, with Ammann, BOMAG, Dynapac and Hamm all having developed advanced control packages. The technologies vary widely but the advantages are broadly similar, with smart compaction allowing the user a greater degree of control over the compaction process and delivering major reduc
  • Major upgrade for Chicago O’Hare Airport
    August 14, 2015
    Internationally, airports are being upgraded and expanded to increase capacity and safety – Mike Woof writes. All around the world, airports are being expanded and upgraded, both to cope with massive increases in passenger numbers and also to handle larger aircraft. Runways have to be rebuilt with stronger structures and surfaces to handle greater air traffic volumes as well as increased loads from larger aeroplanes. Building airport runways, however, poses many challenges for construction crews. Paving qua
  • Expectations for growth of UAE infrastucture
    February 9, 2012
    The INTERMAT Middle East event is being launched at a pivotal time of major infrastructure development in the region. As with most sectors, the highways industry has not had a fantastic 18 months in the Gulf. Not only has the recession impacted the delivery of projects across the board, GCC Governments' attention have been switching increasingly to rail, as plans to roll out a Gulf-wide rail system gather steam. GCC countries will invest over US$119.6 billion in infrastructure projects over the next decade
  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and