Skip to main content

More Saudi airport capacity

A major expansion programme is underway at King Abdulaziz International Airport in Jeddah, Saudi Arabia. The work started in the third quarter of 2006 and is due for completion in 2015, with the construction activity being carried out in three main stages. Once the work is complete the airport will be able to handle up to 80 million passengers/ year, compared with 13 million/year before construction commenced. The project also includes three new terminal buildings and a high-speed rail link, as well as airf
October 12, 2012 Read time: 2 mins
An Sp500 slipform paver from Wirtgen is playing a major role in upgrading Jeddah airport in Saudi arabia

A major expansion programme is underway at King Abdulaziz International Airport in Jeddah, Saudi Arabia. The work started in the third quarter of 2006 and is due for completion in 2015, with the construction activity being carried out in three main stages. Once the work is complete the airport will be able to handle up to 80 million passengers/ year, compared with 13 million/year before construction commenced. The project also includes three new terminal buildings and a high-speed rail link, as well as airfield hard standing and paved areas, lighting, fuel network systems and storm water drainage network.

The project includes erecting a support services building, upgrades to the existing South and North Terminals and improvements to the existing runway and airfield systems so as to allow the airport to handle the larger Airbus A380 aircraft. Three new crescent-shaped passenger halls will be sited to the south of the current international terminal, itself benefiting from improvements. New road and rail links to the airport will also allow for improved passenger access to and from the site.

The phased increase in capacity will see the airport able to handle 30 million passengers/year at the end of the first stage, followed by 60 million/year at the end of the second stage and reaching the final 80 million/year once the work is complete.

The work is being carried out so as to allow aircraft movements to continue without interruption.

Related Content

  • Kenya rehabilitates, widens, tolls Northern Corridor
    November 8, 2017
    A massive highway project in Kenya will boost transport for the country as well as its neighbours - Shem Oirere reports. Kenya has commenced the process of rehabilitating, expanding and tolling of 657km of East Africa’s Northern Corridor that is anchored on the Indian Ocean port of Mombasa and which links the gateway with landlocked countries of Uganda, Rwanda, Burundi and parts of eastern Democratic Republic of Congo (DRC).
  • Asphalt airport runway refurbishment
    February 17, 2012
    Swedish contractor Peab Asfalt generally works on major road and highway projects in the inland portion of the country. However the company has shown itself able to take on a considerable challenge, by repaving an airport runway.
  • Indonesia’s improved airport benefits from new runway
    September 19, 2019
    A new runway surface has been constructed at Yogyakarta International Airport in Indonesia.
  • Bitumen technology ideal for road repairs
    July 4, 2012
    Mike Woof discusses some novel developments relating to bitumen In the developed countries of Western Europe there is an increasing shift away from new highway construction to maintaining and rebuilding existing roads. In Germany alone, a network of asphalt roads extending more than 600,000km will have to be maintained or repaired. Highway maintenance techniques do vary between European countries but some commonalities exist. There are techniques that have been sidelined in the last few years but which now