Skip to main content

The concrete plan for drilling

Four tips for optimising concrete dowel drill performance - *Rick Walstad, E-Z Drill Inc president and CEO
July 9, 2018 Read time: 4 mins
Concrete dowel drill maintenance ensures reliability and efficiency

Four tips for optimising concrete dowel drill performance - *Rick Walstad, 2976 E-Z Drill Inc president and CEO

When faced with drilling thousands of concrete dowel holes, the last thing a project needs is a delay due to drill issues. However some key suggestions can help contractors to stay on top of budgets and timelines.   

An important point for a contractor is choosing the right type of concrete dowel drill for a job and there are two different variants to choose from. Concrete dowel drills can operate with a roller bearing feed system while others use a nylon pad system. Both systems move the gangs forward and backward, however friction is the key difference between the two. When nylon pads slide across the carriage it causes friction that loosens the pads and causes them to wear quickly. This means more maintenance, replacement parts and downtime. A roller bearing feed system, on the other hand, features rollers that move the gangs forward and backward on the carriage without friction, which means minimal maintenance and enhanced uptime.

Another important point is with the air supply as a concrete drill cannot function without it and will perform poorly if the air supply is insufficient. When matching an air compressor to a drill, many models will require 2.83m3/min for each drill motor, so a two-gang unit will typically need 5.66m3/min and a three-gang will need 8.49m3/min.

Also, if the drill air hose has too small a diameter, it will not be able to move sufficient air to the drill, resulting in reduced power and drilling speed. A larger diameter air hose, however, will have no effect on drill performance.

To check if a compressor is the right size for a multigang drill, a good option is to turn off all but one of the drill motors. If the remaining drill motor speeds up, then this shows that there is insufficient air volume to keep the drills operating at full capacity. A drill’s owner’s manuals should be an important guide with regard to compressor output and hose sizes.

Using a concrete drill that has not been maintained is one of the most common reasons a drill may not be performing at 100%. Clearly, it is important to regularly check key maintenance points, with oil being the first point.

Oil is critical to concrete dowel drill performance and if an incorrect grade is used, the engine and components could be in jeopardy. Lubricants, such as pneumatic tool oil and automatic transmission fluid, burn off quickly, which can cause drill motor damage. They also contain synthetics, which can damage hoses and O-rings. Rock drill oil is the only kind of oil that should be used with these types of drills.

Check oil as often as once or twice a day, depending on the model, if a drill is in high use  it is crucial to keep the fittings and guide wheels greased.

 

Concrete drills experience a good amount of vibrations during operation, and those vibrations can loosen nuts and bolts over time. Be sure to check trunnion bolts, which secure the latch that holds the bit in the drill. In addition, look at the long bolts that hold the drill motor together or through bolts. Broken trunnion bolts or through bolts can become loose and break, and that can mean costly replacements.

Dry firing can also cause these bolts to break, so be sure to only run the drill when the bit is touching the concrete and drilling into the slab. Also, turn the motor off before retracting the bit from the hole.

And, finally, clean the drill daily using a hose or pressure washer. Dust accumulates quickly on parts and if allowed to become wet, can quickly turn into concrete, which has a significant effect on performance.

If a drill will be stored for a few days or months, it is vital to lubricate its interior parts to prevent rust from forming. Disconnect the hose from the motor and pour a small amount of lubricant (rock drill oil, pneumatic tool oil, even diesel fuel) directly into the motor. Run it at half throttle for a moment to thoroughly coat the interior parts.

Drain condensation from the machine’s filters and cover the drill with a tarp if it will be stored outside.

Before using the drill, ensure the oil reservoir is full and bolts are tight. If it has wheels, check the tyre pressure and blow out the hose that runs between the drill and compressor to ensure it is clean. If dirt or debris has accumulated in the hose, it could be forced into the motor when it starts, affecting the drill’s performance.

Take care of a concrete drill and it will work properly, from ample power for optimal  day-to-day performance to firing right up. This all equates to greater uptime and profits.

 

For more information on companies in this article

Related Content

  • Volvo CE stages successful six-site paving demo
    April 11, 2013
    Volvo Construction Equipment’s (CE) dealer in the Netherlands, Kuiken, recently hosted a live, five-day demonstration program using a Volvo P7820C ABG paver machine. On a road trip across the country, the Kuiken team visited six different customers, travelling more than 1,700km in total, and clocking up more than 60 hours of paving. “We wanted to test how the market and existing customers, as well as potential ones, would react to the Volvo P7820C ABG machine,” says Arjen Mostert, sales & support manager of
  • Innovations in piling technology
    December 15, 2017
    The market for piling machines is seeing new technology come to market – Mike Woof writes UK firm BSP is now offering an improved range of piling systems, with its SL30 model and compact BH120. The SL30 can be used to drive Z piles in pairs and its hammer has a drop weight of 2.5tonnes, delivering an impact energy of 30kNm at up 84blows/minute. The SL piling hammer is designed for driving sheet piles and small bearing piles and is available with legs and inserts for use when freely suspended or with back
  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as
  • Roadtec’s improved Shuttle Buggy offers increased uptime
    April 23, 2018
    A key development for the latest version of Roadtec’s Shuttle Buggy material transfer vehicle is its improved uptime. As Roadtec continues to develop this machine, it is improving performance and capabilities, boosting output while lowering running costs. The firm first introduced its Guardian telematics system on the Shuttle Buggy some years ago, but has continued to develop the capabilities of this package. The addition of more sensors within the Shuttle Buggy at key points allows performance and wear to