Skip to main content

3D GPR technology makes for speedy surveys

Traffic-speed surveys using 3D ground penetrating radar (GPR) are slashing the time required for surveying the UK’s motorways, and allowing a more thorough analysis of the pavement layers and condition.
August 21, 2019 Read time: 3 mins
New systems allow high speed scans of road surface quality

The UK’s Transport Research Laboratory (777 TRL) was the first organisation in the UK to use 3D GPR for this purpose in 2014, said Adam Cook, data manager, asset surveys at TRL who has been working with GOR for two decades. Since then the equipment and processing software have improved and TRL is now looking at new uses for the technology. 3D GPR is more commonly used for surveying underground utilities such as pipes and cables. In pavement surveys, it can be used to identify the thickness of the different paving layers, voids or areas of damage. Cook’s team first proposed the use of 3D GPP on a Smart Motorways project, which involves changing the configuration of the carriageways to incorporate more lanes.


“The specification called for a cross-carriageway cross-section every 250m. To do that using a traditional 2D GPR system would have required that we close the road and push the equipment across the carriageway every 250m,” said Cook. “For a large survey, involving several tens of kilometres, that’s a lot of lane closures.”

Using the 3D GPR, travelling at 88km/h, meant that TRL could survey a 25km stretch of motorway in both directions in two or three days, as opposed to two or three months using 2D radar. TRL uses a 3D GPR system called GeoScope from Norwegian company 3D-Radar. “I am very much a proponent of traffic-speed surveys,” says Cook. “This was the first time I had seen a system that would be capable of doing that.”

National roads authority 8100 Highways England liked TRL’s proposal, not only because it was faster but because it was safer: it did not require people to be working on the roads. The other big benefit, explained Cook, is that you can take a cross-section at whatever point you wish.

“You may not need a cross-section every 100m. You want to look at the road and see where the construction is changing and take more sections there,” said Cook. On the Smart Motorways programme, where lane positions are moved, the joint between old lanes can sometimes end up being the most heavily trafficked part of the pavement.

Since that first project for Highways England, TRL has carried out several more predesign surveys across the Smart Motorways programme. Over that time, there have been some improvements to the system. The antenna or bar that emits and receives the radar is now wider and the software to help process the data has improved.

“The analysis is still manual,” said Cook, “for instance identifying where the interface between materials is. But the software has improved so that there are more tools to help with that.”

Now 3D GRP is used for other related surveys such as bridge or tunnel decks. TRL is about to start a trial of the technology for investigating the filter drains that run down the sides of motorways. These often get full of silt, which only becomes apparent when they flood.

“We have done some work in the past using radar to investigate silting levels in filter drains, but sometimes it’s difficult to see what’s going on from one section down the middle of the drain,” said Cook. “We would like to use 3D to get a good picture of what is going on.”

Filter drain surveys could become a regular part of the inspection and maintenance regime to prevent flooding events, he added.

For more information on companies in this article

Related Content

  • Data collection key to software developments
    February 13, 2012
    The collection and handling of data are key technology drivers in the software sector. New methods of data collection and manipulation are driving significant developments in software at present. The latest technology allows designers and engineers to collect, store and manipulate ever larger amounts of data. Growing use of mobile field equipment for both data collection and field management is driving interactive systems. And in an interview this month Autodesk senior vice-president for the construction an
  • UN Summit launches Urban Electric Mobility Initiative to force leading cities into electric vehicles by 2030
    October 1, 2014
    The New York United Nations Climate Summit has prioritised four global transport initiatives as part of the eight actions areas that the summit has named as “critical for keeping global temperature increases to less than two degrees Celsius,” and the Urban Electric Mobility Initiative (UEMI) has taken centre stage. UEMI wants cities with a specific target to ensure that electric vehicles make up 30% of their total urban vehicle population by 2030 at the latest. Joan Clos, UN-Habitat Executive Director us
  • Western Sydney Airport Bulk Earthworks
    November 7, 2023
    The massive Bulk Earthworks project, under development by the federal government-owned Western Sydney Airport (WSA), entails construction of an international airport on the western side of Sydney, Australia.
  • Bitumen technology reduces maintenance costs
    April 12, 2023
    Looming net zero deadlines, and impetus from the private sector are accelerating the take up of carbon-saving technologies