Skip to main content

Poland’s A1 section Pyrzowice to Tuszyn clears another hurdle

The Polish province of Lodzkie has signed a territorial contract that will allow construction of the Pyrzowice to Tuszyn section of the national A1 motorway. Territorial contracts are agreements between the central and regional governments in order to allow investment in key projects, such as roads. Around 90 projects worth in total US$7.63 billion will benefit from the contract. Apart from the 140km A1 motorway section, projects include rail line upgrades, Wielun and Belchatow ring roads hospital extensio
November 11, 2014 Read time: 2 mins
The Polish province of Lodzkie has signed a territorial contract that will allow construction of the Pyrzowice to Tuszyn section of the national A1 motorway.

Territorial contracts are agreements between the central and regional governments in order to allow investment in key projects, such as roads. Around 90 projects worth in total US$7.63 billion will benefit from the contract. Apart from the 140km A1 motorway section, projects include rail line upgrades, Wielun and Belchatow ring roads hospital extension work.

3260 World Highways reported in February last year that Poland's General Directorate for National Roads and Motorways (1361 GDDKiA) was looking to tender for the work between Pyrzowice near Katowice and Tuszyn near the city of  Lodz. The work, estimated to cost in total $2.66 billion, was going to be let in lots of around 20km.

The 568km A1, officially called Amber Highway, is a north-south motorway still under construction running through central Poland and is part of the European route E75. The A1 starts in port of Gdańsk on the Baltic Sea through to Łódź and the Upper Silesian Industry Area of Gliwice to the Polish-Czech border in Gorzyczki. At the border it connects to the Czech motorway D1.

For more information on companies in this article

Related Content

  • Poland to boost high-speed road construction in 2017
    January 24, 2017
    Poland plans to issue a number of major highway construction tenders early this year as part of plan to boost the number of high-speed road projects started in 2017. Around €4.84 billion be spent this year on road construction and maintenance. Expected to be on offer is the missing A1 section between Tuszyn and Czestochowa as well as construction of an S61 dual carriageway from Ostrowia Mazowiecka to Szczuczyn. Polish media reported that around 124km of dual carriageways and motorways were built last
  • Consortium signs contract for section of S5 expressway in Poland
    August 8, 2014
    A consortium consisting of Heilit+Woerner (a subsidiary of Austrian company Strabag) and Budimex, has signed the contract to build a section of the S5 expressway between Poznań and Wrocław, Poland, with a gross value of about €138 million.
  • Polish capital route project being planned
    September 9, 2019
    Route reviews are being carried out for a key Polish project. Poland’s highways authority, GDDKiA, is analysing the four potential routes for the S10 road, which will connect with Warsaw’s outer ring road, itself still to be completed. The different routes have estimated costs ranging from €5.34 billion to €5.99 billion and all connect with the A1, though at different intersections. Financing for the work should be secured by 2020, with tendering expected in 2025 and construction due to commence in 2026.
  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the