Skip to main content

Huge repair bill for Britain's potholes

Following one of the coldest winters in recent memory, Britain’s roads have stacked up an estimated £10 billion (€11.5 billion) repair bill just for potholes. These are caused by the freeze/thaw cycle: water seeps into cracks in the road surface, expands when frozen and then breaks up when it thaws. It has been estimated that in Britain there is at least one pothole for every 110m (sometimes many more) and that it will take at least 15 years to fix the problem.
May 15, 2012 Read time: 1 min
The coldest winter for many years has exploited Britain's roads, resulting in thousands of potholes
Following one of the coldest winters in recent memory, Britain’s roads have stacked up an estimated £10 billion (€11.5 billion) repair bill just for potholes.

These are caused by the freeze/thaw cycle: water seeps into cracks in the road surface, expands when frozen and then breaks up when it thaws.

It has been estimated that in Britain there is at least one pothole for every 110m (sometimes many more) and that it will take at least 15 years to fix the problem.

At present it is estimated that, apart from main routes such as motorways, there are some 1.6 million potholes on Britain’s 390,000km of secondary roads.

According to David Weeks, director of the Asphalt Industry Alliance (AIA), the country’s road network is in danger of falling to “Third World” levels.

Related Content

  • UK: 50 Years of motorways
    July 6, 2012
    On 5 December, 2008 Britain’s motorway network celebrated its 50th anniversary, and to mark the occasion the Road Users’ Alliance (RUA) published ‘50 Years of Motorways,’ which claims that from a slow and modest start (over 30 years behind its European neighbours) the UK network has never managed to catch up. According to the publication, in the 1960s and early 1970s motorways were viewed as a route to renewal and prosperity. The network made some headway and grew to 2,500km; it crawled a further 1,000km ov
  • ACE/AECOM report: private sector and user-pay for English roads
    May 14, 2018
    It’s one minute to midnight for funding England’s roads, according to a timely new report, and the clock’s big hand is pointing to some form of user-pay solution, reports David Arminas Is there any way out of future user-pay funding for England’s highway infrastructure? The answer is a resounding ‘no’, according to the recently published report: Funding Roads for the Future. The brief 25-page document by the London-based Association for Consultancy and Engineering, ACE**, sums up the state of England’s ro
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • Road repair option
    February 14, 2012
    Italian firm Massenza is boosting its range of road repair machines with the introduction of an innovative unit that combines the functions of an emulsion sprayer and chippings spreader. According to Diego Massenza, "We have made a prototype and it has been running now for two years." The machine can be used to spread chippings and then immediately after, spray emulsions or polymer-modified bitumen (PMB). Massenza explained that the firm is expanding its range of road repair machines as it sees a particular