Skip to main content

Huge repair bill for Britain's potholes

Following one of the coldest winters in recent memory, Britain’s roads have stacked up an estimated £10 billion (€11.5 billion) repair bill just for potholes. These are caused by the freeze/thaw cycle: water seeps into cracks in the road surface, expands when frozen and then breaks up when it thaws. It has been estimated that in Britain there is at least one pothole for every 110m (sometimes many more) and that it will take at least 15 years to fix the problem.
May 15, 2012 Read time: 1 min
The coldest winter for many years has exploited Britain's roads, resulting in thousands of potholes
Following one of the coldest winters in recent memory, Britain’s roads have stacked up an estimated £10 billion (€11.5 billion) repair bill just for potholes.

These are caused by the freeze/thaw cycle: water seeps into cracks in the road surface, expands when frozen and then breaks up when it thaws.

It has been estimated that in Britain there is at least one pothole for every 110m (sometimes many more) and that it will take at least 15 years to fix the problem.

At present it is estimated that, apart from main routes such as motorways, there are some 1.6 million potholes on Britain’s 390,000km of secondary roads.

According to David Weeks, director of the Asphalt Industry Alliance (AIA), the country’s road network is in danger of falling to “Third World” levels.

Related Content

  • Concern over the state of US bridges
    April 1, 2019
    Bridge condition is a serious concern in the US, according to a new report from American Road & Transportation Builders Association (ARTBA).
  • Salini Impregilo makes shortlist for Sydney Gateway project
    November 11, 2019
    Salini Impregilo is on the shortlist for Australia’s US$1.8 billion Sydney Gateway project to improve connections around Sydney Airport and Port Botany.
  • Warm mix/cold climates
    February 28, 2012
    MeadWestvaco (MWV) says that its Evotherm warm mix asphalt technology is now approved by the Colorado Department of Transportation (Colorado DOT) for use in statewide paving projects. The warm mix asphalt system can be used in any traditional hot-mix asphalt application, but with significantly lower temperatures required for paving application. This feature is particularly useful in Colorado's high altitude paving projects and has been tested extensively.
  • Expanded and branded: RER Vélo bike project
    April 29, 2022
    Connected up cycling is becoming more important in France as the way to keep cyclists from giving up their COVID habit of pedalling to work and for pleasure. David Arminas reports.