Skip to main content

Repaving Barcelona Airport runway surfaces

A Spanish contractor has utilised an asphalt plant from Ammann to deliver high-quality material for a key runway at Barcelona Airport. The firm Benito Arnó e Hijos, won the deal to provide asphalt for the reconstruction of the main runway at Barcelona-El Prat Airport. The firm opted to use an Ammann ABT 280 SpeedyBatch plant for the project as this model offered the combination of both mobility and productivity as required. With the short-term nature of the project, a fixed plant would have been unsuitable
November 8, 2017 Read time: 2 mins
An Ammann mobile plant supplied asphalt for the repaving of a key runway at Barcelona Airport

A Spanish contractor has utilised an asphalt plant from 6791 Ammann to deliver high-quality material for a key runway at Barcelona Airport. The firm Benito Arnó e Hijos, won the deal to provide asphalt for the reconstruction of the main runway at Barcelona-El Prat Airport.

The firm opted to use an Ammann ABT 280 SpeedyBatch plant for the project as this model offered the combination of both mobility and productivity as required. With the short-term nature of the project, a fixed plant would have been unsuitable as the installation was only on a temporary basis, so the mobile unit proved a good fit for the project. Meanwhile as the runway being resurfaced carries the majority of air traffic at the airport, there was a very strict timeframe within which the reconstruction could be carried out, so a high output was necessary. The contractor had to produce a high-quality grade of asphalt 24 hours/day for close to one month and with a maximum output of 280tonnes/hour, the plant delivered around 14,000tonnes of material in all.

Paving and compaction work was carried out to very tight specifications so as to ensure a high-quality surface that could cope with the stresses exerted by aircraft take-offs and landings. Since this job was completed, the mobility of the plant has allowed the contractor to dismantle the unit and move it to another location for the next project. After carrying out the job in Barcelona, the plant was transferred to other jobsites and at Madrid-Barajas Airport, it was used for a very similar job involving runway renewal.

For more information on companies in this article

Related Content

  • Concrete mixing technology offers advanced recipes
    February 13, 2012
    Modern concrete production plants are using technology to offer more sophisticated mix recipes as Patrick Smith reports. The growing trend towards ever more sophisticated concrete recipes calls for fully developed mixing technology. Companies are responding to the challenges with equipment that offers new levels of sophistication including computer controls and units that can deliver a huge variety of mix recipes.
  • Building an airport for St Helena
    August 29, 2013
    The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
  • Upgrade for Mumbai airport
    February 9, 2012
    Work is continuing to upgrade Chhatrapati Shivaji International Airport (CSIA), India's largest airport in Mumbai, the country's largest city.
  • Upgrade for Mumbai airport
    April 10, 2012
    Work is continuing to upgrade Chhatrapati Shivaji International Airport (CSIA), India's largest airport in Mumbai, the country's largest city.