Skip to main content

Repaving Barcelona Airport runway surfaces

A Spanish contractor has utilised an asphalt plant from Ammann to deliver high-quality material for a key runway at Barcelona Airport. The firm Benito Arnó e Hijos, won the deal to provide asphalt for the reconstruction of the main runway at Barcelona-El Prat Airport. The firm opted to use an Ammann ABT 280 SpeedyBatch plant for the project as this model offered the combination of both mobility and productivity as required. With the short-term nature of the project, a fixed plant would have been unsuitable
November 8, 2017 Read time: 2 mins
An Ammann mobile plant supplied asphalt for the repaving of a key runway at Barcelona Airport

A Spanish contractor has utilised an asphalt plant from 6791 Ammann to deliver high-quality material for a key runway at Barcelona Airport. The firm Benito Arnó e Hijos, won the deal to provide asphalt for the reconstruction of the main runway at Barcelona-El Prat Airport.

The firm opted to use an Ammann ABT 280 SpeedyBatch plant for the project as this model offered the combination of both mobility and productivity as required. With the short-term nature of the project, a fixed plant would have been unsuitable as the installation was only on a temporary basis, so the mobile unit proved a good fit for the project. Meanwhile as the runway being resurfaced carries the majority of air traffic at the airport, there was a very strict timeframe within which the reconstruction could be carried out, so a high output was necessary. The contractor had to produce a high-quality grade of asphalt 24 hours/day for close to one month and with a maximum output of 280tonnes/hour, the plant delivered around 14,000tonnes of material in all.

Paving and compaction work was carried out to very tight specifications so as to ensure a high-quality surface that could cope with the stresses exerted by aircraft take-offs and landings. Since this job was completed, the mobility of the plant has allowed the contractor to dismantle the unit and move it to another location for the next project. After carrying out the job in Barcelona, the plant was transferred to other jobsites and at Madrid-Barajas Airport, it was used for a very similar job involving runway renewal.

For more information on companies in this article

Related Content

  • High precision concrete production
    February 24, 2012
    Innovative plants are coming to the market to produce various types of concrete including new mixes as Patrick Smith reports
  • Road recycling train from Wirtgen in Nigeria
    March 9, 2022
    The Wirtgen Group has worked with Julius Berger Nigeria (JBN) in Nigeria to deliver a landmark project
  • Major Pisa link gets upgrade
    February 29, 2012
    Recycling with foamed bitumen is being used for lane reconstruction on the SP11 road in Italy, where contractor F.lli Lepri is carrying out work on a 14km section. The SP11 is an important link forming part of the Colline per Legoli Highway connecting the SS67 Tosco-Romagnola Highway near Pontedera with the southeast region of Pisa Province up to the borders of Florence Province.
  • Cost effective road maintenance
    February 7, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports