Skip to main content

Hitex offers fast and reliable crack and pothole repairs for asphalt roads

Clearview Traffic brand Golden River’s innovative M210 Logging Stud for planners and road operators is said to be achieving global sales success among those looking for a low-cost vehicle counting solution for both permanent and occasional data collection. The M210 solar powered logging stud provides accurate count information in a simple self-contained unit that can be installed quickly and easily, thus minimising costs, saving valuable time and most importantly disruption with installation and ongoing
June 24, 2014 Read time: 2 mins
707 Clearview Traffic brand 3937 Golden River’s innovative M210 Logging Stud for planners and road operators is said to be achieving global sales success among those looking for a low-cost vehicle counting solution for both permanent and occasional data collection.

The M210 solar powered logging stud provides accurate count information in a simple self-contained unit that can be installed quickly and easily, thus minimising costs, saving valuable time and most importantly disruption with installation and ongoing maintenance costs.

The simple in-road counting stud is said to have established worldwide recognition through a number of successful installations spanning Europe, USA and Australasia. From visitor car parks at country parks and permanent car park counting at shopping malls, to monitoring vehicle flow at recycling centres alongside more complex data collection of traffic volume in capital cities, the M210 logging stud has demonstrated its multi-purpose qualities. Among its many features are solar energy harvesting, low power radio communications and magnetometer-based vehicle detection.

Prior to its use of the M210 logging stud, The Department of Infrastructure Traffic and Transport in Amsterdam, Holland, used ad hoc temporary surveys deploying tube and radar counters across multiple locations several times a year to give them a snapshot picture of the city’s traffic flow. However, this caused significant disruption and frustration for road users during installation and was becoming quite costly.

Seeing the chance to become more cost-effective, the city has now deployed 130 of the M210 logging studs that are able to collect data 24/7 365 days a year and offer the ability to provide additional data outside the existing contractual agreement without incurring any further installation costs. This has helped gain valuable insight into traffic movements surrounding major events that take place in Amsterdam, such as when the new King was sworn in during April 2013, and has resulted in a number of subsequent installations.

In New South Wales, Australia, the Roads and Maritime Service wanted to establish a more complete picture of traffic flows in and out of the region. Over 450 M210 studs have now been installed across the province with more planned. Following extensive testing and on-road trials by the Road Authority in NSW, the major advantages of the M210 logging stud over other technology are said to have shone through.

For more information on companies in this article

Related Content

  • Speed management on freeways
    June 22, 2012
    Characteristics of traffic speed and flow in managed freeways - *Dr Adrian Withill. In order to maximise the benefits of existing infrastructure, in terms of reduced delays and increased safety, many governments have recently been introducing projects that measure traffic speed and flow and automatically introduce advisory or mandatory speed limits. Such schemes tend to offer relatively quick wins at relatively lower capital costs than traditional highway construction. In light of the current world economy,
  • Asphalt plant technology and effects on production costs
    November 14, 2017
    Asphalt plants are industrial units capable of producing asphalt on a full-scale basis An asphalt plant has several key functions and is designed to accurately dose the aggregates and asphalt to ensure the correct proportions, as established in the mix. The plant should dry and heat the aggregates completely, regardless of their nature and characteristics, in order to obtain perfect adhesiveness with the asphalt binder. The drying system’s combustion gases have to be filtered so that fine aggregates tran
  • First concrete beam raised for new Mersey bridge link
    December 11, 2015
    The first concrete bridge beam for a junction on the new Mersey Gateway route has been lifted into place. Work is underway on a major road junction for the Mersey Gateway Project, with the first of 156 of the concrete beams has been lifted into place as work ramps up at a major road junction. A 550tonne capacity crane lowered the 106tonne beam into position at the Bridgewater junction in Runcorn, where the new Astmoor Bridgewater viaduct is being built over the Bridgewater canal. Two elevated slip roads ar
  • SWARCO sets up live-lane running in Germany
    February 28, 2023
    SWARCO’s system spans 2.8km along the hard shoulder of the A8 motorway between Karlsruhe and Karlsbad in southwest Germany.