Skip to main content

Brazilian business in Brumadinho benefiting from breaking

A Brazilian extraction operation is using a Rammer 3288 hydraulic hammer in a secondary breaking application The unit is helping maximise production at a facility in Brumadinho. The 2.04tonne hydraulic hammer is being used to increase the production of Itabirite at the FLAPA Mining site. Part of the Top Mix Group, the company operates in the heavy construction, dredging, mining, assembly and operation of processing and ore crushing plants. At the company’s Fábrica Mine, Jangada Mine, Capão Xavier Mine
June 10, 2015 Read time: 2 mins
A Brazilian extraction operation is benefiting from a Rammer hammer for secondary breaking
A Brazilian extraction operation is using a 5076 Rammer 3288 hydraulic hammer in a secondary breaking application The unit is helping maximise production at a facility in Brumadinho. The 2.04tonne hydraulic hammer is being used to increase the production of Itabirite at the FLAPA Mining site. Part of the Top Mix Group, the company operates in the heavy construction, dredging, mining, assembly and operation of processing and ore crushing plants.   

At the company’s Fábrica Mine, Jangada Mine, Capão Xavier Mine, and Capitão do Mato Mine, which  are all operated by main contractor 5926 Vale, this quest for innovation and efficiency led to the purchase of the Rammer 3288 to break up oversized material prior to crushing and processing. “The iron ore is extracted from the mine primarily using explosives,” explained general manager Paulo Thiago Miranda. “Any oversized material that is too large for the crusher is broken again using the Rammer 3288.”

Miranda also said that the Rammer hammer represented a significant investment, but that his company was willing to pay a premium. "We consider Rammer a premium brand. It is a bigger financial investment, but we have fewer maintenance problems and a marked gain in production. Also, it has the credibility of the 325 Sandvik name behind it.” With the relatively remote location of the mine and its dependence upon the reliability of the Rammer unit, FLAPA is reliant upon the aftersales support provided by local Rammer dealer, Rock Brit.   

“Despite the tough working environment and long working hours in dusty conditions, the hammer has stood up well. In the first seven months of operation, we have had to order no parts. On the one occasion that it was sent to Rock Brit, it was only for washing and reading of the Ramdata diagnostic information,” commented Paulo Thiago Miranda.

For more information on companies in this article

Related Content

  • Tough demolition tools from Brokk
    February 3, 2020
    Brokk now offers three new concrete crusher models; the CC440, CC480 and CC580. The attachments, made by its German sister company, Darda, offer contractors high-performance tools and are said to boost operator safety and productivity.
  • Desert quarry supplies major road projects
    February 10, 2012
    Egyptian contractor Orascom has set up a new quarry site in the country's desert area, close to the city of Assuit. The quarry was opened specifically to supply Orascom's major road construction projects in this area of Egypt, with high quality aggregates.
  • Sandvik gives Argentine advantage to Canteras Amadeo
    February 20, 2014
    Cutting-edge Sandvik Construction equipment is said to be giving ambitious Argentinian quarry firm Canteras Amadeo a commercial advantage Starting life as a one-quarry enterprise in Córdoba, Argentina, in 1999, Canteras Amadeo is a flourishing business with additional operations in Cordoba and Santiago del Estero. Key to its success is said to be its owners’ embrace of technological improvement, and their choice of Sandvik equipment to improve their processes.
  • Innovations in aggregates production will boost quarry efficiency
    March 16, 2016
    New innovations are underway that will help optimise rock crushing and screening operations and boost quarry efficiency overall - Mike Woof writes. Quarrying is a tough industry that provides enormous challenges to equipment providers as machines and technology have to be rugged, durable and productive. Cutting the cost of production while optimising output has been a major target for suppliers, with new technologies playing an increasingly important role. Taking the long view with regard to increased qu