Skip to main content

M25 maintenance contract for Tarmac in UK

Contractor Tarmac has won a deal that will see the firm carrying out maintenance work on the UK’s M25 motorway. The contract is worth some £10 million/year and is for M25 operator and maintenance company, Connect Plus. The M25 motorway is one of the busiest road links in Europe and runs around UK capital London. The agreement will be for a period of up to 12 years and will see Tarmac carrying out resurfacing work for a total of 440km of motorway as well as the key link roads around London. Tarmac will also
May 25, 2017 Read time: 2 mins
Contractor Tarmac will carry out maintenance work on the UK’s busy M25 motorway
Contractor 2399 Tarmac has won a deal that will see the firm carrying out maintenance work on the UK’s M25 motorway. The contract is worth some £10 million/year and is for M25 operator and maintenance company, Connect Plus. The M25 motorway is one of the busiest road links in Europe and runs around UK capital London. The agreement will be for a period of up to 12 years and will see Tarmac carrying out resurfacing work for a total of 440km of motorway as well as the key link roads around London. Tarmac will also be working closely with Connect Plus and other firms with responsibilities for the M25 in a bid to optimise efficiency through all stages of the asset management process.


Paul Fleetham, managing director of Tarmac Contracting, said: “This major award reflects our strong working relationship with Connect Plus and our proven track record of close collaboration with network operators to improve network capacity, minimise disruption and prioritise the safety of road users.  

“As well as providing skilled delivery and technical expertise, we will draw on our extensive asphalt plant network in the south east to provide on-demand access to high-quality materials.”

Tarmac’s commitment to working in partnership with Connect Plus and other M25 community members to drive efficiencies and develop new industry leading innovative methods of working were key factors in securing the deal.  The award builds on Tarmac’s previous five-year contract with Connect Plus.

The contract includes resurfacing, milling and joint sealing across the M25 to reduce whole-life costs and minimise maintenance demands on the network.    

Chris Richardson, Connect Plus’ commercial director, said “We are excited to be working with a group of highly motivated and skilled suppliers to take the 30 year DBFO concession successfully through the next 10 years and beyond.”

For more information on companies in this article

Related Content

  • Increased asphalt demand - meeting the challenge
    February 8, 2012
    With demand for asphalt predicted to increase, manufacturers are ready to meet the challenge as Patrick Smith reports
  • The radically changing face of UK highways management
    May 14, 2014
    The British Government policy paper ‘Action for Roads: A network for the 21st century’ sets out radical change to the strategic way roads are funded and managed – including plans to turn the Highways Agency into a Government-owned company and a pledge to invest over €33.4 billion (£28 billion) in roads maintenance between 2015 and 2020. Jenny Moten, Highways Agency divisional director for Network Services, gave a keynote presentation on the new approach to strategic highways management during the Road Safet
  • UK: FM Conway and Nynas agree Thames River bitumen storage deal
    April 15, 2015
    Infrastructure services contractor FM Conway has signed a deal to supply Nynas, a UK provider of bitumen binder, with bitumen from its recently rebuilt Imperial Wharf terminal. The facility is on the River Thames in the town of Gravesend, near the mouth of the river and down river from London. FM Conway invested around €3.5 million to refurbish the terminal which was finished last September. The terminal has the capacity to dock and store up to 7,500tonnes of bitumen. Under the deal, Nynas will bas
  • Fast resurfacing work in UK by contractor Eurovia
    May 15, 2017
    In the UK the contractor Eurovia has recently carried out a challenging resurfacing job within a tight timescale. The firm had to contend with live traffic on a busy stretch of motorway, while carrying out the work close to shared intersections. The traffic was particularly heavy also during part of the job due to a holiday period and large numbers of tourist vehicles using the stretch of motorway.