Techniques can help in preventing cracks in underlying layers from penetrating to new surface layers - *Farzad Tooryani. For road repairs involving milling off worn asphalt surface layers before repaving, the use of crack sealing is a crucial task. This can help to prevent full reflection of existing cracks from underneath layers into the new wearing course. Once the milling work is complete, locating existing cracks is a crucial task for the site supervisor. Efficient routing equipment that is easy to hand
October 20, 2017 Read time: 3 mins
Once applied the sealant should be left for a week before paving is carried out

Techniques can help in preventing cracks in underlying layers from penetrating to new surface layers - *Farzad Tooryani

For road repairs involving milling off worn asphalt surface layers before repaving, the use of crack sealing is a crucial task. This can help to prevent full reflection of existing cracks from underneath layers into the new wearing course. Once the milling work is complete, locating existing cracks is a crucial task for the site supervisor. Efficient routing equipment that is easy to handle and fast in operation is used to prepare the cracks.

Where the crack width is less than 10mm, the user can rout the crack to a depth of 10mm. But if the width is greater than 10mm, the user should set the router to 20mm. The operator can guide the router on the cracks and follow them backward.

A key task after routing is to ensure that the area is clean of any debris as leaving any loose material or dust in place can result in a failure of the whole process. Using compressed air to blow out the debris is a useful technique, while a hot air lance (HAL) can also play a key role on sites where surface humidity levels are high. Any moisture left on the sides of the crack can result in early failures.

The user has to select a rubberised hot applied sealant that best suits the materials and weather conditions. This sealant can then be gravity fed using cones into the crack area, a simple and easy method to carry out. Indirect heating of the sealant in a special kettle before the material is applied is important for the best rest results. Heating the sealant ensures that it bonds properly with the sides of the crack, providing a longer lasting repair. For the most efficient application, the kettle should be equipped with an oil jacketed tank and simultaneous agitation.

Applying the sealant so that its top surface is around 2mm lower than the milled surface will minimise the need for raking with the new overlay. Once the sealant has been applied to the cracked areas, waiting for a week will then allow the material to settle properly. And before the new asphalt layer is laid, the milled surface should be cleaned effectively and also a suitable tack coat layer applied to ensure effective bonding. 

*Farzad Tooryani - owner & general manager at 8640 Sunway Sealing, the Middle East representative for Marathon Equipment

For more information on companies in this article

Related Content

  • Asphalt airport runway refurbishment
    February 17, 2012
    Swedish contractor Peab Asfalt generally works on major road and highway projects in the inland portion of the country. However the company has shown itself able to take on a considerable challenge, by repaving an airport runway.
  • Reduced emissions, costs, with recycled asphalt
    February 21, 2012
    Recycling is a key issue for asphalt road construction, with many technologies now coming to market. Bith an ever increasing emphasis on sustainability forcing change in the construction sector in Europe and North America, the highway sector now has to seek new solutions.
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during
  • Infrared asphalt repair speeds pothole repairs
    April 4, 2012
    Improved infrared asphalt repair technology is speeding pothole repairs in applications in North America.