Skip to main content

BOMAG: paver's world premiere

Construction equipment manufacturer BOMAG will have a special focus on milling machines and finishers, and will feature two product premieres: the new BOMAG BF 800 finisher (world premiere) and the sales launch of the BM 500/15 compact planer, plus milling drums for third party cold milling machines in the 500mm class.
February 15, 2012 Read time: 2 mins
World premiere at Samoter: BOMAG'S BF 800
Construction equipment manufacturer 172 Bomag will have a special focus on milling machines and finishers, and will feature two product premieres: the new BOMAG BF 800 finisher (world premiere) and the sales launch of the BM 500/15 compact planer, plus milling drums for third party cold milling machines in the 500mm class.

It will also have a cross-section of its product range, from vibratory tampers, the successful BMP 8500 trench compactor, tandem rollers, single drum rollers using the latest measuring technology, through to the MPH 125 stabiliser/recycler with foamed bitumen system.

The newly-developed BF 800 with 20tonne operating weight and maximum screed width of up to 10m complements the company's current asphalt paver portfolio, and is available in track and wheeled versions with 6x6 all-wheel drive and electrically-heated screeds as standard.

Another highlight will be the start of sales of the BM 500/15 compact milling machine first shown as a prototype at 688 Bauma 2010, along with the sales launch of a range of quick-change milling drums for the BM 500/15, which is also being offerd for compact milling machines from other manufacturers in the 500mm class.

For more information on companies in this article

Related Content

  • Multiple asphalt plants supply major highway construction
    July 12, 2012
    One company has produced eight asphalt plants for a major project, and others are introducing new models as Patrick Smith reports Algeria's US$11.2 billion East-West Highway development, the world's largest current highway construction project, forms part of the larger Trans-Maghreb Motorway project, and is scheduled for completion in 2010. It will run for 1,216km, ensuring the link between Annaba in the north-east and Tlemcen in the north-west, passing directly through 24 provinces and linking Algeria to T
  • Warm asphalt is a hot topic
    June 12, 2012
    Lower temperature mixes – a key advance in bitumen technology - Kristina Smith reports Warm and cold mix asphalts were not on the original agenda for this year’s Eurasphalt & Eurobitume Congress, being held in Istanbul in June. But when the organisers took a look through the papers submitted for their sustainability-themed event, they realised that this is one of the industry’s hottest topics. “We hadn’t quite anticipated the high level of research in this area,” says E&E’s technical programme committee c
  • Efficient new asphalt compactors from leading firms
    March 12, 2014
    New asphalt compactors from leading firms offer greater versatility and lower running costs - Mike Woof writes
  • Vögele sets paving record in German capital
    September 16, 2015
    Material transfer vehicles and remixing systems are crucial to delivering quality paving. Using material transfer vehicles (MTVs) can play a major role in delivering high quality road surfaces. These units can help boost quality by minimising the risk of material or thermal segregation. A major road paving project has been carried out in Germany using innovative paving methods. For the first time ever, binder and surface courses were paved over a width of 15.5m. This paving job was carried out on a 4.2km st