Skip to main content

Uganda sees new highway and bridge work

Uganda's Aswa Bridge and Mbarara-Katuna highway will be repaired in a deal worth US$160 million.
February 27, 2012 Read time: 1 min
Uganda's Aswa Bridge and Mbarara-Katuna highway will be repaired in a deal worth US$160 million. Work on the upgrades will commence towards the end of 2010 with the repairs and improvements to the 164km highway expected to use most of the resources supplied. The projects will boost safety and cut travel times as well as cutting maintenance needs. The 1116 European Union is providing some of the money required while the Ugandan Government will contribute the remainder, although the exact split has not been revealed at this stage.

For more information on companies in this article

Related Content

  • Healthy bidding for Poland's highway construction
    May 14, 2012
    Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.
  • Bridge inspection: destructive versus non-destructive methods
    January 6, 2015
    Tens of thousands of bridges in the United States are in desperate need of repair. But where to begin analysing their deteriorating state? Roger Roberts* investigates tips and techniques for ensuring bridge safety The average age of America’s more than 600,000 crumbling bridges is 42 years – many are 60 to 80 years old. The situation is dire, with many described as functionally obsolete, according to the American Society of Civil Engineers’ latest edition of its Report Card for America’s Infrastructure.
  • Nicaragua road project funding deal
    February 1, 2018
    Nicaragua’s Ministry of Transport and Infrastructure (MTI) is setting out its road development programme for 2018. In all the plans call for the construction of 171km of roads. Work will be completed for the road from Mulukuku to Siuna, with the first 23km stretch due to open in September 2018 and the remaining 21.5km expected in December 2018. Meanwhile the road from Nueva Guinea to San Francisco should be complete by November 2018. Work started on these two routes in 2016. The project also calls for
  • Oklahoma turnpike project for Atkins
    April 12, 2018
    Atkins, part of the SNC-Lavalin Group, is providing construction management services for the Oklahoma Turnpike Authority (OTA).