Skip to main content

Brazil's flood damage

Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding.
February 23, 2012 Read time: 1 min
Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding. In all 185 bridges and five roads will have to be repaired or rebuilt, with the work expected to cost in the region of US$237.6 million. Severe weather conditions caused the flooding, which was particularly heavy in in the hilly regions of Nova Friburgo, Teresopolis, Sumidouro, Petropolis, Bom Jardim, Sao Jose do Vale do Rio Preto and Areal. Of the funding allotted to the work around $177.4 million will be needed for bridge rebuilding, with some $66.2 million needed for road repairs. Many bridges suffered severe scour due to the flooding, resulting in structural problems as well as a number of collapses.

Related Content

  • Innovative bridge design in the US wins key industy award
    June 24, 2019
    The HDR-designed Marc Basnight Bridge in North Carolina recently won the Deep Foundation Institute’s Outstanding Project Award.
  • Kenya road repairs required following flooding
    May 29, 2018
    Recent heavy rains in Kenya have caused extensive damage to the road network, washing away road surfaces and signage and causing scouring of bridges. As much as US$180 million may be required to carry out the necessary repairs to the road network. Nairobi and its surrounding area have been particularly badly hit. The city’s central business district and various industrial areas are key to the country’s economy and have suffered extensive damage to various road sections, so repairing these areas is seen as a
  • Italy’s horrific bridge collapse is a sign of a wider problem
    January 7, 2019
    The shocking collapse of a major highway bridge in the Italian city of Genoa has highlighted a major problem with regard to poor infrastructure condition in the country. Causing multiple fatalities, the cable-stayed Morandi Bridge suffered a spectacular failure of a central support. Homes have had to be evacuated and it seems likely that the bridge, opened in 1967, will now have to be demolished. However, warnings had been given. The unusual bridge design, with its thin deck and reinforced concrete stays
  • Pakistan rebuilding flood-damaged infrastructure
    January 26, 2017
    Pakistan is setting out plans to rebuild infrastructure that has been damaged by flooding. The work to rebuild highways and bridges damaged by the flooding is expected to cost nearly US$219 million. Funding to help pay for the work is being provided in the shape of a loan worth close to $197 million from the Philippines-based Asian Development Bank (ADB). Pakistan’s National Highways Authority (NHA) has set out a programme of works that involves repairing and upgrading a total of 212km of road as well as 33