Skip to main content

Brazil's flood damage

Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding.
February 23, 2012 Read time: 1 min
Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding. In all 185 bridges and five roads will have to be repaired or rebuilt, with the work expected to cost in the region of US$237.6 million. Severe weather conditions caused the flooding, which was particularly heavy in in the hilly regions of Nova Friburgo, Teresopolis, Sumidouro, Petropolis, Bom Jardim, Sao Jose do Vale do Rio Preto and Areal. Of the funding allotted to the work around $177.4 million will be needed for bridge rebuilding, with some $66.2 million needed for road repairs. Many bridges suffered severe scour due to the flooding, resulting in structural problems as well as a number of collapses.

Related Content

  • Historic US bridge upgrade in Washington DC
    July 8, 2016
    A heavily-used bridge of historic importance in US capital Washington DC looks set to benefit from much-needed improvement works. The work will be part funded by a US$90 million from the US Department of Transportation. The structure of the Arlington Memorial Bridge has become degraded over time and has been highlighted in a number of reports as being in dire need of a major rebuild. The 651m bridge links Washington District with Arlington County, carrying around 68,000 vehicles/day. But in all the bridge i
  • Golden opportunities in the MINT - Mexico, Indonesia, Nigeria, Turkey
    May 21, 2015
    Mexico, Indonesia, Nigeria, Turkey – Global Report offers up some food for thought about where smart money might be headed within the next several years – David Arminas writes China’s rate of growth may be slowing down, but other South East Asian companies are being quick to offer alternate investment opportunities, notably Indonesia. Nigeria, too, has had issues with security of investment. But there are signs that the government may be getting serious at last about tightening up rules and regulation
  • US$73 million Francis Scott Bridge replacement contract
    September 3, 2024
    Kiewit has been awarded a US$73 million Francis Scott Bridge replacement contract.
  • Ground penetrating radar used to investigate tunnel deterioration
    May 13, 2015
    Using ground penetrating radar to determine reason for serious pavement settling in Kentucky-Tennessee tunnel Just a few years after the opening of the Cumberland Gap Tunnel, highway officials noticed moderate to severe settling of the continuously reinforced concrete pavement. The mountain tunnel provides an important link between Kentucky and Tennessee along US25E and the problem looked serious, with many voids discovered beneath the pavement surface. To investigate the problems, the Kentucky Transpor