Skip to main content

Brazil's flood damage

Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding.
February 23, 2012 Read time: 1 min
Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding. In all 185 bridges and five roads will have to be repaired or rebuilt, with the work expected to cost in the region of US$237.6 million. Severe weather conditions caused the flooding, which was particularly heavy in in the hilly regions of Nova Friburgo, Teresopolis, Sumidouro, Petropolis, Bom Jardim, Sao Jose do Vale do Rio Preto and Areal. Of the funding allotted to the work around $177.4 million will be needed for bridge rebuilding, with some $66.2 million needed for road repairs. Many bridges suffered severe scour due to the flooding, resulting in structural problems as well as a number of collapses.

Related Content

  • The Russian government is set to revise roadbuilding standards and technologies
    May 29, 2013
    The Russian government is considering revising standards and technologies of roadbuilding in the country, writes Eugene Gerden. The aim is to accelerate implementation of one of the major public projects in the transport industry of Russia in the coming years: expansion of the road network from the current 900,000km to 1.3 million km by 2030 as part of the current Russian State Transport Strategy. According to a recent study, conducted by analysts of the Presidential Head Control Directorate, maintaining th
  • Date set for delayed New Zealand highway
    May 20, 2022
    The opening date has been set for a delayed New Zealand highway project.
  • Balanced Mix Design in the US could revolutionise pavement design and testing
    April 30, 2018
    Roads in the US keep failing so the Federal Highways Authority is proposing a new approach to mix design, but what does this mean for tests and testing? - Kristina Smith reports How do you test an asphalt mix for rutting? In the US, the answer could be any one of several tests, depending on which State you are in: Asphalt Pavement Analyser, Flow Number, Hamburg Wheel Tracking Test, Superpave Shear Test or Triaxial Stress Sweep Test. But that could all change. The Federal Highways Agency (FHWA), part of
  • Economic crisis affecting industry?
    September 14, 2015
    The recent news over the falling share prices around the world due to Chinese economic instability is of major concern for the construction sector. The knock-on effect of a downturn and economic instability in China has impacted around the world, with stock markets in Europe and the US having taken a tumble. This development should not be a surprise however. It is a situation that has been coming for some time due to the high level of spending in China and which many in the construction industry have bee