Skip to main content

Brazilian project due

Work on the eastern section of Sao Paulo's Mario Covas orbital highway is being given the official go-ahead. Approval has been given by Sao Paulo's state environmental agency Consema for the 44.5km extension of the highway.
February 9, 2012 Read time: 2 mins
Work on the eastern section of Sao Paulo's Mario Covas orbital highway is being given the official go-ahead. Approval has been given by Sao Paulo's state environmental agency, 2527 Consema, for the 44.5km extension of the highway. The work will be carried out by concessionaire 2529 Dersa and is expected to cost US$1.54 billion. The new section of highway will connect the southern stretch in Maua to the future intersection with President Dutra highway in Aruja. A total of 102 conditions were imposed including protection of water bodies, vegetation, and relocation of habitations. The east section marks the third phase of construction of the orbital which is expected to vastly improve traffic flow. Meanwhile Brazilian highway concessionaire CART is starting repairs to highways in Sao Paulo State's Raposo Tavares Corridor by the end of April 2010. The highways affected are: Joao Baptista Cabral Renno (from Bauru to Santa Cruz do Rio Pardo), Orlando Quagliato (from Santa Cruz to Ourinhos) and Raposo Tavares (from Ourinhos to Presidente Epitacio). The total cost is expected to reach $125.34 million andincludes resurfacing 351.8km, repairs to bridges and viaducts, as well as 50% of the drainage system. The work is due for completion by December 2010. Highway SP 225 (Joao Baptista Cabral Renno) will be widened to three lanes.

For more information on companies in this article

Related Content

  • Brazil road auctions set for this quarter
    October 14, 2024
    Sao Paulo state is due to auction the Sorocabana, the first concession, by the end of the month.
  • IL&FS to widen Patna-Gaya-Dobhi road in India’s Bihar state
    October 16, 2014
    The National Highways Authority of India (NHAI) has awarded a highway widening contract worth US$202 million (INR 12.32 billion) to IL&FS Engineering and Construction Company. IL&FS will widen to four lanes 127km of the Patna-Gaya-Dobhi section of NH-83 in the north eastern Indian state of Bihar. The project is due for completion in three years and it will be undertaken under the Official Development Assistance Loans programme of the Japan International Cooperation Agency (JICA).
  • A tricky road update is planned for an important rural road in Brazil
    September 27, 2013
    Brazilian consultant SOTEPA has been closely involved with infrastructure improvements in a series of projects in the southern state of Santa Catarina. One of the most important of these has been design work for the SC-477 state highway, which connects the east of the state to Brazil’s Littoral zone and the BR-101 federal highway. The SC-477 has had to be upgraded as part of it has been unsurfaced, without an asphalt surface between Itaiópolis and Doutor Pedrinho. The road provides an important link for the
  • Immersed tunnel planned for Sao Paulo
    August 9, 2012
    Plans are being drawn up for an immersed tunnel close to Sao Paulo in Brazil. The tender process is being initiated to find a consultancy company prepared to handle the engineering design work. The tunnel will connect Santos and Guaruja. The US$6.1 million engineering tender is being offered by Brazilian company Desenvolvimento Rodoviario (Dersa).