Skip to main content

Brazilian project due

Work on the eastern section of Sao Paulo's Mario Covas orbital highway is being given the official go-ahead. Approval has been given by Sao Paulo's state environmental agency Consema for the 44.5km extension of the highway.
February 9, 2012 Read time: 2 mins
Work on the eastern section of Sao Paulo's Mario Covas orbital highway is being given the official go-ahead. Approval has been given by Sao Paulo's state environmental agency, 2527 Consema, for the 44.5km extension of the highway. The work will be carried out by concessionaire 2529 Dersa and is expected to cost US$1.54 billion. The new section of highway will connect the southern stretch in Maua to the future intersection with President Dutra highway in Aruja. A total of 102 conditions were imposed including protection of water bodies, vegetation, and relocation of habitations. The east section marks the third phase of construction of the orbital which is expected to vastly improve traffic flow. Meanwhile Brazilian highway concessionaire CART is starting repairs to highways in Sao Paulo State's Raposo Tavares Corridor by the end of April 2010. The highways affected are: Joao Baptista Cabral Renno (from Bauru to Santa Cruz do Rio Pardo), Orlando Quagliato (from Santa Cruz to Ourinhos) and Raposo Tavares (from Ourinhos to Presidente Epitacio). The total cost is expected to reach $125.34 million andincludes resurfacing 351.8km, repairs to bridges and viaducts, as well as 50% of the drainage system. The work is due for completion by December 2010. Highway SP 225 (Joao Baptista Cabral Renno) will be widened to three lanes.

For more information on companies in this article

Related Content

  • Pakistan moves on Havelian-Thakot section of China-Pak Corridor
    June 18, 2015
    Pakistan’s infrastructure and economic development agency the Central Development Working Party approved six projects worth US$865 million, including the China-Pak Economic Corridor (CPEC) Raikot section Phase-1. The Raikot section is the 120km Havalian-Thakot stretch and alone is worth around $830 million, according to a report from The Nation newspaper. The agency’s approval is for land acquisition, affected properties compensation and relocation of utilities to give the road a throughway. A report
  • Brazil road concessions ending
    January 8, 2019
    A number of major road concession agreements in Brazil are coming to the end of their terms by 2021. This includes eight concession packages for key routes, extending some 2,400km in all and generating over US$521 million/year in toll revenue. Tendering will have to be carried out for all of these routes, with two of the most prominent being the Nova Dutra highway linking Sao Paulo with Rio de Janeiro and the 218km Washington Luis highway in Sao Paulo State. At present CCR has the concession for the Nov
  • São Paulo calls US$1.6bn Tamoios highway PPP
    March 24, 2014
    Brazil's São Paulo state is due to call a tender by March 28 2014 to concession its Tamoios highway, a government official is reported to have told regional media. "Governor Geraldo Alckmin will be officially announcing the launch of the tender next week [Mar 24-28]," the official said last week without giving further details. Budgeted at US$1.61 billion (BRL 3.74 billion), the concession involves operating and maintaining the Planalto and Serra stretches of the Tamoios highway, also known as SP-99, which
  • Cold recycling helps rebuild of Brazil’s Ayrton Senna highway
    September 28, 2015
    Brazil’s Ayrton Senna Highway has been rebuilt using cold recycling. Brazil’s SP-070 is also known as the Ayrton Senna Highway and is a major highway in the country, carrying heavy traffic volumes. For its rebuild, the time-saving, cost-efficient and eco-friendly benefits of the cold recycling process have been put to the test. The SP-070 provides a key transport link between São Paulo and Campos do Jordão, Vale do Paraíba and Rio de Janeiro, as well as being the main access route to Guarulhos Interna