Skip to main content

Brazilian project due

Work on the eastern section of Sao Paulo's Mario Covas orbital highway is being given the official go-ahead. Approval has been given by Sao Paulo's state environmental agency Consema for the 44.5km extension of the highway.
February 9, 2012 Read time: 2 mins
Work on the eastern section of Sao Paulo's Mario Covas orbital highway is being given the official go-ahead. Approval has been given by Sao Paulo's state environmental agency, 2527 Consema, for the 44.5km extension of the highway. The work will be carried out by concessionaire 2529 Dersa and is expected to cost US$1.54 billion. The new section of highway will connect the southern stretch in Maua to the future intersection with President Dutra highway in Aruja. A total of 102 conditions were imposed including protection of water bodies, vegetation, and relocation of habitations. The east section marks the third phase of construction of the orbital which is expected to vastly improve traffic flow. Meanwhile Brazilian highway concessionaire CART is starting repairs to highways in Sao Paulo State's Raposo Tavares Corridor by the end of April 2010. The highways affected are: Joao Baptista Cabral Renno (from Bauru to Santa Cruz do Rio Pardo), Orlando Quagliato (from Santa Cruz to Ourinhos) and Raposo Tavares (from Ourinhos to Presidente Epitacio). The total cost is expected to reach $125.34 million andincludes resurfacing 351.8km, repairs to bridges and viaducts, as well as 50% of the drainage system. The work is due for completion by December 2010. Highway SP 225 (Joao Baptista Cabral Renno) will be widened to three lanes.

For more information on companies in this article

Related Content

  • Highway projects underway in Brazil
    April 3, 2014
    Work is underway securing the finances for key highway projects in Brazil. The tender process for the US$1.72 billio Tamoios Highway project is now underway and the bids are due in mid-May 2014, according to Business News Americas. The project involves a 30 year concession package to operate and maintain the SP-99 Planalto and Serra stretches of the Tamoios highway, connecting the coastal cities of São José dos Campos and Caraguatatuba. The contract also involves 21.5km of road widening along the Serra stre
  • Chinese investors eye Brazilian work, including federal highway BR-153
    January 14, 2016
    Chinese investors are reported to be negotiating a contract to work on a section of federal highway BR-153 that goes from Anapolis in the Brazilian state of Goias to Palmas,n in Tocantins. The road is part of the Transbrasiliana Highway. The section was originally awarded to Brazilian construction firm Galvao Engenharia in September 2014, but the company never started expansion works.
  • Brazil’s budget cuts threaten the Santos-Guaruja immersed tunnel
    August 18, 2015
    Adjustments to Brazil's budget could pose a threat to the planned immersed tunnel between Santos and Guaruja in Sao Paulo state, local media reported.

    Sao Paulo state had put the project out to tender and had verbal support from the national treasury to borrow up to US$2 billion to finance the project. However, because of the economic crisis, this support has not materialised.

    The tunnel would by 1.7km long, carry six lanes of traffic and be at an estimated depth of 35m.
  • El Sillar – Bolivia’s challenging road project
    February 6, 2020
    Construction of Bolivia’s El Sillar highway, the country’s most complicated road project – Mauro Nogarin reports