Skip to main content

Brazilian project due

Work on the eastern section of Sao Paulo's Mario Covas orbital highway is being given the official go-ahead. Approval has been given by Sao Paulo's state environmental agency Consema for the 44.5km extension of the highway.
February 9, 2012 Read time: 2 mins
Work on the eastern section of Sao Paulo's Mario Covas orbital highway is being given the official go-ahead. Approval has been given by Sao Paulo's state environmental agency, 2527 Consema, for the 44.5km extension of the highway. The work will be carried out by concessionaire 2529 Dersa and is expected to cost US$1.54 billion. The new section of highway will connect the southern stretch in Maua to the future intersection with President Dutra highway in Aruja. A total of 102 conditions were imposed including protection of water bodies, vegetation, and relocation of habitations. The east section marks the third phase of construction of the orbital which is expected to vastly improve traffic flow. Meanwhile Brazilian highway concessionaire CART is starting repairs to highways in Sao Paulo State's Raposo Tavares Corridor by the end of April 2010. The highways affected are: Joao Baptista Cabral Renno (from Bauru to Santa Cruz do Rio Pardo), Orlando Quagliato (from Santa Cruz to Ourinhos) and Raposo Tavares (from Ourinhos to Presidente Epitacio). The total cost is expected to reach $125.34 million andincludes resurfacing 351.8km, repairs to bridges and viaducts, as well as 50% of the drainage system. The work is due for completion by December 2010. Highway SP 225 (Joao Baptista Cabral Renno) will be widened to three lanes.

For more information on companies in this article

Related Content

  • Concrete pavers improve major highway upgrade
    July 13, 2012
    In Brazil, concrete pavers from Wirtgen are being used to improve sections of the BR-101 highway as well as to construct concrete safety barriers. The use of these machines is of note as it is the first time concrete paving has been used on a federal road in Brazil. The 1st Army Engineering Division of the Brazilian Army is carrying out three of the eight North Eastern sections, as the construction work had to be speeded up project because the road is deemed crucial to the country's economy. Two Wirtgen SP8
  • US$2.1 billion for two Brazil road projects
    July 1, 2024
    A US$2.1 billion funding package will help pay for two Brazilian road projects.
  • Brazil weighs its WIM options
    July 21, 2021
    Recent legislation in Brazil is allowing greater use of weigh-in-motion technology, all in an attempt to address some familiar challenges, writes Intercomp's Jon Arnold.
  • US$337 million São Paulo road revamp
    February 1, 2024
    A US$337 million revamp is planned for São Paulo’s Pinheiros Marginal road