Skip to main content

Brazilian project due

Work on the eastern section of Sao Paulo's Mario Covas orbital highway is being given the official go-ahead. Approval has been given by Sao Paulo's state environmental agency Consema for the 44.5km extension of the highway.
February 9, 2012 Read time: 2 mins
Work on the eastern section of Sao Paulo's Mario Covas orbital highway is being given the official go-ahead. Approval has been given by Sao Paulo's state environmental agency, 2527 Consema, for the 44.5km extension of the highway. The work will be carried out by concessionaire 2529 Dersa and is expected to cost US$1.54 billion. The new section of highway will connect the southern stretch in Maua to the future intersection with President Dutra highway in Aruja. A total of 102 conditions were imposed including protection of water bodies, vegetation, and relocation of habitations. The east section marks the third phase of construction of the orbital which is expected to vastly improve traffic flow. Meanwhile Brazilian highway concessionaire CART is starting repairs to highways in Sao Paulo State's Raposo Tavares Corridor by the end of April 2010. The highways affected are: Joao Baptista Cabral Renno (from Bauru to Santa Cruz do Rio Pardo), Orlando Quagliato (from Santa Cruz to Ourinhos) and Raposo Tavares (from Ourinhos to Presidente Epitacio). The total cost is expected to reach $125.34 million andincludes resurfacing 351.8km, repairs to bridges and viaducts, as well as 50% of the drainage system. The work is due for completion by December 2010. Highway SP 225 (Joao Baptista Cabral Renno) will be widened to three lanes.

For more information on companies in this article

Related Content

  • Brazilian project attracts strong interest
    April 30, 2012
    Interest is strong in Brazil’s BR-101 highway project. The tender for the project will open on 18th January 2012. According to Brazil's Land Transport Agency (ANTT), at least six groups, most Brazilian, have shown interest in the project. The stretch to be put out to tender totals 476km, of which 458km is in Espirito Santo. The ANTT states that US$1.24 billion will be invested in the BR-101, with plans to widen the highway in stages. The concession period for the road totals 25 years and the highway will fe
  • Brazilian state of São Paulo announces bids for ring road
    May 28, 2012
    The Governor of São Paulo, Geraldo Alckim, has confirmed that the regional road development agency Dersa, has received 25 pre-qualification bids for the tender to build six phases of the north stretch of the Brazilian city’s ring road. Of the bids, 17 are organised in consortia. Companies from Spain, Italy, France, Portugal, Mexico, Argentina and Korea are among those seeking the ring road tender. The reference price of the major infrastructure project is estimated at US$ 3.11billion, and the International
  • Brazil highway project being analysed for viability
    July 22, 2014
    Caixa Economica Federal will analyse a proposal for support US$264.42 million for recovery work on Brazil’s Rodovia Presidente Dutra highway. The proposal has been put forward by Brazilian road operator CCR and needs to be approved by Caixa before any funds can be released. Authorisation for this analysis process to go ahead was given by the board of the FI-FGTS investment fund. The funds would go to the recovery work along the 402km highway that connects Sao Paulo with Rio de Janeiro. CCR has operated the
  • Tenders being opened in Brazil for highways and tunnel projects
    February 6, 2014
    A series of major project tenders are opening in Brazil. The Brazilian Government has announced five new road tenders to be launched in 2014. The highway sections run for a total distance of some 2,625km. This programme of works will lengthen the country’s highway network by some 2,282km, with the work costing an impressive US$7.39 billion in all. The roads include the BR-163, BR-364 and BR-153 in the Central West region, and the BR-476 stretch in the South, in addition to the Rio-Niteroi Bridge in Rio de J