Skip to main content

Safer surfaces

Transpo Industries has two new products: the T-28 colour-safe surface and T-78 polymer crack sealer.
February 6, 2012 Read time: 1 min
350 Transpo Industries has two new products: the T-28 colour-safe surface and T-78 polymer crack sealer. The T- 28 is an acrylic-based resin system used for pavement area markings and anti-skid surfacing. It is used for bicycle/pedestrian paths, bus stops/lanes and other specially designated areas. This product also improves skid-resistance and its colour warns users of hazardous turns and other high accident areas on asphalt and concrete roadways. The T-78 product is a low viscosity, methyl methacrylate resin system that is effective for sealing and filling cracks in concrete. It bonds well to the inner walls of cracks, restoring strength and preventing crack propagation. T-78 polymer crack sealer is capable of rapid cure in a wide range of temperatures.

For more information on companies in this article

Related Content

  • Safety risk if construction projects speed up
    February 27, 2012
    Many governments worldwide are using investment in infrastructure as a means to help tackle the current economic conditions. New highway construction, widening and repair contracts as well as bridge and tunnel projects that had been planned, are now being accelerated to help the industry and provide construction jobs.
  • Advancing asphalt plant technology
    June 9, 2016
    Advances in asphalt plant technology were in major evidence at the bauma 2016 exhibition in Munich - Mike Woof writes One of the most apparent developments at bauma 2016 was the strong focus on asphalt plant technology. The massive physical presence of the asphalt plants could be seen from a distance, right across the showground, particularly the 50m-high machine Benninghoven had opted to exhibit. However, other plant systems from rival firms Ammann, Lintec and Marini, as well as Turkish company E-MAK, c
  • Autonomous road paving
    October 7, 2024
    Strabag handles autonomous road paving trial in Austria.
  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai