Skip to main content

Safer surfaces

Transpo Industries has two new products: the T-28 colour-safe surface and T-78 polymer crack sealer.
February 6, 2012 Read time: 1 min
350 Transpo Industries has two new products: the T-28 colour-safe surface and T-78 polymer crack sealer. The T- 28 is an acrylic-based resin system used for pavement area markings and anti-skid surfacing. It is used for bicycle/pedestrian paths, bus stops/lanes and other specially designated areas. This product also improves skid-resistance and its colour warns users of hazardous turns and other high accident areas on asphalt and concrete roadways. The T-78 product is a low viscosity, methyl methacrylate resin system that is effective for sealing and filling cracks in concrete. It bonds well to the inner walls of cracks, restoring strength and preventing crack propagation. T-78 polymer crack sealer is capable of rapid cure in a wide range of temperatures.

For more information on companies in this article

Related Content

  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • New tunnelling technology saves time
    February 15, 2012
    New tunnelling technology from BASF has helped cut construction time on a major tunnel project in Australia. The system has been used to speed waterproofing, an important point as the link runs underneath one of Australia's major rivers. The spray-applied polymer membrane provided by a BASF sprayed concrete machine saved time and effort on the construction of the Clem Jones 7 Tunnel (Clem 7) in Brisbane, Australia. The 4.8km tunnel was completed seven months ahead of schedule and at its lowest point Clem 7
  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports
  • Quality assured with asphalt testing equipment
    March 15, 2012
    Equipment for checking out the various qualities required of asphalt in road construction is becoming more sophisticated