Skip to main content

ELE International's multi-channel GDU

ELE International is launching the Geotechnical Data Acquisition Unit (GDU), a multi-channel data logger which can co-ordinate test data from several different soil tests at the same time. This development means that a wide range of soil tests can be carried out in a very cost effective way, with accurate and reliable results, says ELE. Combining the GDU with the transducers from the various soil tests and ELE’s geotechnical software package DS7, creates a system which can co-ordinate and supervise the vari
January 3, 2013 Read time: 2 mins
7056 ELE International is launching the Geotechnical Data Acquisition Unit (GDU), a multi-channel data logger which can co-ordinate test data from several different soil tests at the same time. This development means that a wide range of soil tests can be carried out in a very cost effective way, with accurate and reliable results, says ELE.

Combining the GDU with the transducers from the various soil tests and ELE’s geotechnical software package DS7, creates a system which can co-ordinate and supervise the various tests and then produce results sheets compliant with most international standards. The GDU communicates with a PC containing the DS7 software via a standard connection.

While the methods and equipment for soil testing has been evolving continuously since the 1950s and ‘60s, data processing remained expensive and time-consuming until relatively recently. “These latest packages automate the analysis and reporting of results enabling the time and costs associated to test soil to be reduced considerably, while ensuring results are both accurate, consistent and in line with the latest standards,” according to ELE.

For more information on companies in this article

Related Content

  • Innovations in concrete paving technology
    March 16, 2012
    Paving with concrete offers a strong and long life base for a roadway, with manufacturers continuing to develop technologies – Mike Woof reports. Innovation comes fast in the concrete paving market with a number of specialist suppliers offering an array of solutions to meet the needs of slipforming contractors. These machines can be used for a range of applications from large-scale airport runway or highway construction duties, tunnel jobs, bridge decks, barriers, traffic islands and kerbs. Because the app
  • Developments in tolling technology
    February 27, 2012
    Jason Barnes reviews the last few decades and the future of tolling technology. Tolling and charging technology has evolved significantly over the last three decades and that evolution is perhaps best illustrated by reductions in or complete removal of impedances to physical progress. Once, it was customary for a driver to pull up to a barrier, make some form of cash payment to a human operative in a booth, and then wait for the barrier to be raised before proceeding. Humans were eventually complemented and
  • Milling efficiently with machine control
    July 11, 2018
    A contractor in the Netherlands has found that using Topcon’s latest machine control technology can deliver higher quality work at higher productivity The firm, Van Gelder, was looking for a solution to survey, mill and resurface a 7km length of the N518 to the island of Marken more quickly, more safely and more accurately. Together with Infra-Techniek, the company opted to use the latest package developed by Topcon for automatic milling. The N518 from Monnickendam is the only connecting road to the form
  • Milling efficiently with machine control
    July 11, 2018
    A contractor in the Netherlands has found that using Topcon’s latest machine control technology can deliver higher quality work at higher productivity The firm, Van Gelder, was looking for a solution to survey, mill and resurface a 7km length of the N518 to the island of Marken more quickly, more safely and more accurately. Together with Infra-Techniek, the company opted to use the latest package developed by Topcon for automatic milling. The N518 from Monnickendam is the only connecting road to the form