Skip to main content

ELE International's multi-channel GDU

ELE International is launching the Geotechnical Data Acquisition Unit (GDU), a multi-channel data logger which can co-ordinate test data from several different soil tests at the same time. This development means that a wide range of soil tests can be carried out in a very cost effective way, with accurate and reliable results, says ELE. Combining the GDU with the transducers from the various soil tests and ELE’s geotechnical software package DS7, creates a system which can co-ordinate and supervise the vari
January 3, 2013 Read time: 2 mins
7056 ELE International is launching the Geotechnical Data Acquisition Unit (GDU), a multi-channel data logger which can co-ordinate test data from several different soil tests at the same time. This development means that a wide range of soil tests can be carried out in a very cost effective way, with accurate and reliable results, says ELE.

Combining the GDU with the transducers from the various soil tests and ELE’s geotechnical software package DS7, creates a system which can co-ordinate and supervise the various tests and then produce results sheets compliant with most international standards. The GDU communicates with a PC containing the DS7 software via a standard connection.

While the methods and equipment for soil testing has been evolving continuously since the 1950s and ‘60s, data processing remained expensive and time-consuming until relatively recently. “These latest packages automate the analysis and reporting of results enabling the time and costs associated to test soil to be reduced considerably, while ensuring results are both accurate, consistent and in line with the latest standards,” according to ELE.

For more information on companies in this article

Related Content

  • The Road Ahead
    August 5, 2020
    According to recent figures, there are over 560,000 potholes that pose a risk of damage to vehicles in the UK alone, and the situation is similar in countries across the globe.
  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon
  • Next-generation materials testing with new technology
    August 17, 2022
    The US’s Balanced Mix Design sets the stage for next-generation performance testing, according to CONTROLS’ Andrea Carlessi
  • GPS machine control technology aids productivity
    February 21, 2012
    GPS technology offers contractors many benefits and product offerings are growing more diverse, Mike Woof reports. The benefit of GPS technology for the construction industry cannot be overstated.