Skip to main content

New HQ for Controls Group

Controls Group has relocated from its historic base in Cernusco sul Naviflio to a new facility in the small town of Liscate, 17km from the centre of Milan at the intersection of two new motorway networks. Twice the size of the previous premises, the new building has an internal area of 8,000m2 and will provide space for research and development, production, logistics and an extensive visitor area for demonstrations and training. Controls, which was founded in 1968, had been based at Cernusco sul Naviflio s
January 18, 2016 Read time: 1 min
A solid leadership in concrete compression machines
2139 Controls Group has relocated from its historic base in Cernusco sul Naviflio to a new facility in the small town of Liscate, 17km from the centre of Milan at the intersection of two new motorway networks. Twice the size of the previous premises, the new building has an internal area of 8,000m2 and will provide space for research and development, production, logistics and an extensive visitor area for demonstrations and training.

Controls, which was founded in 1968, had been based at Cernusco sul Naviflio since 1973, and built its previous factory there in 1982.

For more information on companies in this article

Related Content

  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • New Penang Bridge takes shape
    May 9, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • The doors open on a record-breaking bauma China 2018
    November 22, 2018
    You can tell a lot from numbers – and this year’s bauma China exhibition is set to be a record-breaker! The exhibitor numbers represent an impressive 11% increase on the 2,958 exhibitors from 41 countries that presented their products and innovations to around 170,000 visitors at the 2016 event.
  • Beijing construction exhibition will break records
    February 16, 2012
    BICES organisers say a growth in the number of exhibitors, space and scope of the 2011 event assure it of success As the new US$33 billion Beijing-Shanghai 300km/hour bullet train swings into action the organisers of BICES 2011 are also claiming a world-class success. They say that the 11th Beijing International Construction Machinery Exhibition & Seminar 2011 has achieved what it planned with a 25% growth from the previous event (2009) in the number of exhibitors and floor space.