Skip to main content

Earthquake rocks Chilean highways

Chile's highway system has fared remarkably well considering the severity of the massive earthquake that struck the country a few days ago. This is a crucial factor in ensuring that emergency help, food and other aid can reach the worst affected area in the south of the country quickly. The Vespucio Norte highway collapsed and while the Costanera Norte route was slightly damaged, the Vespucio Sur and Autopista Central highways were unaffected.
May 31, 2012 Read time: 1 min
Chile's highway system has fared remarkably well considering the severity of the massive earthquake that struck the country a few days ago. This is a crucial factor in ensuring that emergency help, food and other aid can reach the worst affected area in the south of the country quickly.

The Vespucio Norte highway collapsed and while the Costanera Norte route was slightly damaged, the Vespucio Sur and Autopista Central highways were unaffected. Repairs to the worst affected highways, Vespucio Norte and Ruta 5 Sur, are expected to cost some US$200-250 million however. The repair work may take up to 6-8 months to carry out.

Related Content

  • Dowel bar drilling selection poses challenges
    January 11, 2013
    Pneumatic concrete dowel drills have one purpose – to drill holes. While their intended use is easy to recognize, operation of this equipment isn’t quite so simple. In fact, it’s a bit of a science. That’s not to say they’re difficult to operate. But there are certain best practices and processes to keep in mind for proper drill operation, whether it’s an on-grade, slab-rider or equipment-mounted model. Operators who adopt these guidelines and implement them on every job are rewarded with better performance
  • Caterpillar smoothens Colombian airport
    August 21, 2013
    Cartagena, Colombia’s coastal city attracts large numbers of visitors, generating heavy traffic through the Rafael Nuñez International Airport. However the surface of the runway had suffered from heavy wear, r esulting in bumpy landings and this was in need of repair. In addition, engineers wanted to create a graded, ramped approach to aid with both take-offs and landings. However, the volume of air traffic using the airport meant that construction work had to take place in a tight timeframe, between mi
  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport
  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport