Skip to main content

Bangladesh project delayed

Delays are now expected on work to upgrade the Dhaka-Chittagong highway to dual carriageway status. This delay has been caused by a dispute with the consultant, the National Engineer Service of Pakistan (Nespak). The firm was contracted to monitor implementation of the project but is now requesting a larger fee to carry out the work.
May 31, 2012 Read time: 1 min
Delays are now expected on work to upgrade the Dhaka-Chittagong highway to dual carriageway status. This delay has been caused by a dispute with the consultant, the 5820 National Engineer Service of Pakistan (Nespak). The firm was contracted to monitor implementation of the project but is now requesting a larger fee to carry out the work. As a result Nespak's contract may well be terminated and a new consultant will have to be hired. The upgrade to the highway is costing US$238.5 million although the size of the consultancy package has not been revealed.

For more information on companies in this article

Related Content

  • Three Colombian bridge projects commencing
    January 17, 2019
    In Colombia progress is being seen on three major bridge projects located in different parts of the country. Construction of the new Pumajero Bridge is well in hand and is expected to be complete before the end of 2019. The new PumajeroBbridge will be 2,247m in length and have 990m of viaduct connections and access, as well as two three-lane carriageways on each side. Once the new bridge is open to traffic, the old cable-stayed concrete link between Baranquilla and Sitionuevo will be demolished. The new
  • New elevated highway planned for Bangladesh
    May 31, 2017
    A new elevated highway stretch is being planned for Bangladesh. This route will run between Shah Amanat Airport in Chittagong and Lalkhan Bazar and is intended to cut congestion at peak periods.
  • New UK dual carriageway project commencing
    February 14, 2020
    Work for an important dual carriageway connection in the UK is now moving ahead.
  • Delays for New Zealand expressway project
    August 24, 2020
    Delays are hitting New Zealand’s Otaki expressway project.