Skip to main content

Bangladesh project delayed

Delays are now expected on work to upgrade the Dhaka-Chittagong highway to dual carriageway status. This delay has been caused by a dispute with the consultant, the National Engineer Service of Pakistan (Nespak). The firm was contracted to monitor implementation of the project but is now requesting a larger fee to carry out the work.
May 31, 2012 Read time: 1 min
Delays are now expected on work to upgrade the Dhaka-Chittagong highway to dual carriageway status. This delay has been caused by a dispute with the consultant, the 5820 National Engineer Service of Pakistan (Nespak). The firm was contracted to monitor implementation of the project but is now requesting a larger fee to carry out the work. As a result Nespak's contract may well be terminated and a new consultant will have to be hired. The upgrade to the highway is costing US$238.5 million although the size of the consultancy package has not been revealed.

For more information on companies in this article

Related Content

  • Stonehenge tunnel project being designed
    April 12, 2017
    Consultant AECOM is now working with Highways England on improvements to the busy A303 in the UK. The road upgrades will be carried out between Amesbury and Berwick South Down along a 13km section of the A303 route. AECOM will work with its supply chain partners Mace and Mouchel on the project. As the current alignment for the A303 passes just 165m from the Stonehenge World Heritage site (WHS), there is a strong need to redevelop the route so that it causes less harm to this important archaeological area. T
  • Legal dispute delays Stockholm project
    March 1, 2012
    A legal dispute continues to delay work on Stockholm's Bypass project.
  • New Bangladesh expressway section to be built
    January 27, 2022
    A new Bangladesh expressway section is to be built in capital Dhaka.
  • California delays emissions regulations
    February 23, 2012
    In the US state of California, legislators have now decided to delay tough regulations on emissions from construction equipment fleets. In California construction firms with large machine fleets were preparing themselves for having to re-engine older machines, buy new equipment or risk losing contracts.